The Phase 0 Implementation Profile / PSM SHALL identify implementation artifacts prepared for Part 5 deployment, testability, operation, observation, and evidence planning.

Part 4, Section 21.15: Part 5 Handoff Requirements.

Part 5 depends on a controlled set of implementation artifacts produced and governed by Part 4.

Explicitly identifying those artifacts establishes a clear boundary between defining the Phase 0 implementation baseline and using that baseline for deployment, testability, operation, observation, and evidence planning.

This requirement applies to:

  • Phase 0 implementation artifacts;
  • implementation mappings;
  • configuration artifacts;
  • scripts;
  • repository artifacts; and
  • implementation traceability records.

Verification SHALL confirm that the Phase 0 Implementation Profile / PSM identifies the implementation artifacts prepared for Part 5.

Verification activities should include review checks confirming that:

  • deployment-relevant artifacts are identified;
  • testability-relevant artifacts are identified;
  • observation and operation inputs are identified;
  • evidence-planning inputs are identified; and
  • the handoff remains limited to the approved Phase 0 implementation baseline.

This requirement establishes the controlled implementation baseline that Part 4 provides to Part 5.

Related requirement identifiers:

Related source section:

Draft


© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.

  • dido/99_annexes/annex-d-requirements/part-04/p4-req-21-15-001.txt
  • Last modified: 2026/08/07 14:43
  • by owen