Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
dido:99_annexes:annex-d-requirements:part-02:p2-req-16-6-002 [2026/07/11 12:57] – removed - external edit (Unknown date) 127.0.0.1dido:99_annexes:annex-d-requirements:part-02:p2-req-16-6-002 [2026/07/18 12:33] (current) – external edit 127.0.0.1
Line 1: Line 1:
 +====== P2-REQ-16-6-002 ======
  
 +[[dido:99_annexes:annex-d-requirements:part-02:start| Return to Requirements]]
 +
 +===== Statement =====
 +
 +The [[dido:99_annexes:annex-b-terms-and-definitions:l:logical_control_plane|Logical Control Plane]] SHALL support operational coordination among [[dido:99_annexes:annex-b-terms-and-definitions:l:logical_node|Logical Nodes]].
 +
 +===== Source =====
 +
 +Part 2, Section 16.6: Logical Runtime Plane Requirements.
 +
 +===== Rationale =====
 +
 +The Logical Control Plane provides the architectural foundation for coordinating the behavior of Logical Nodes. Separating operational coordination from information exchange and governance preserves a clear separation of architectural concerns while supporting platform-independent control interactions.
 +
 +===== Applies To =====
 +
 +This requirement applies to the Logical Control Plane.
 +
 +It applies specifically to:
 +
 +  * Logical Control Plane;
 +  * Logical Nodes;
 +  * Control interactions; and
 +  * Logical Interaction Patterns.
 +
 +===== Verification =====
 +
 +Verification SHALL confirm that the Logical Control Plane supports operational coordination among Logical Nodes.
 +
 +Verification activities should include review checks confirming that:
 +
 +  * operational coordination responsibilities are assigned to the Logical Control Plane;
 +  * participating Logical Nodes are identified;
 +  * control interactions remain platform independent; and
 +  * implementation technologies do not redefine the Logical Control Plane.
 +
 +===== Traceability =====
 +
 +This requirement supports traceability between Logical Control Plane interactions, Logical Nodes, and Logical Control interaction patterns.
 +
 +Related requirement identifiers:
 +
 +  * [[dido:99_annexes:annex-d-requirements:part-02:p2-req-16-6-001]]
 +  * [[dido:99_annexes:annex-d-requirements:part-02:p2-req-16-7-005]]
 +  * [[dido:99_annexes:annex-d-requirements:part-02:p2-req-16-7-006]]
 +
 +Related source section:
 +
 +  * [[fxdemo:02-part:16-logical-requirements:16-6-logical-runtime-plane-requirements:start]]
 +
 +===== Status =====
 +
 +Draft
 +
 +----
 +
 +<WRAP centeralign>
 +© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.
 +</WRAP>