A Submission provides the specification material needed to evaluate the proposed Reference Architecture against the requirements of this RFP.
Requirements
-
SIP-042 — Complete Reference Architecture Specification: The Submission SHALL include a complete specification of the proposed Reference Architecture that addresses all applicable requirements defined in Section 6.2 Scope of Proposals Sought and Section 6.3 Relationship to Other OMG Specifications
-
SIP-043 — Integrated Submission Document: The specification MAY be submitted as a single integrated document
This page identifies the subsections for Required Submission Content.
Notes for Editors
The links in this section provide temporary access to the individual Annex C requirement pages while those records are being created and reviewed.
After the Annex C records are complete, replace each locally maintained Statement with a transclusion of the authoritative Statement from its corresponding requirement page.
SIP-042 establishes the required completeness of the submitted specification. SIP-043 permits the specification to be organized as one integrated document but does not require that document organization.
If Section 6.4 has no subordinate pages, remove the sentence introducing the subsections and the Indexmenu statement.