18. Acceptance Criteria

Go To Top

This section defines the acceptance criteria for the Phase 0 Baseline. Acceptance criteria help the team decide whether the Repository, tooling, generated Artifacts, Nodes, Control Plane, Data Plane, containers, documentation, and Evidence satisfy the purpose of Phase 0.


© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.

  • fxdemo/05-part/18-acceptance-criteria/start.txt
  • Last modified: 2026/08/12 16:02
  • by owen