Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
dido:02-crusible:99-annexes:annex-b:cr-002 [2026/07/15 11:34] – removed - external edit (Unknown date) 127.0.0.1dido:02-crusible:99-annexes:annex-b:cr-002 [2026/07/20 07:07] (current) – ↷ Links adapted because of a move operation nick_dido
Line 1: Line 1:
 +====== C2 - Crucible Concept of Operations ======
  
 +[[dido:02-crusible:99-annexes:annex-b:start|Go to Annex B: References]]
 +
 +===== Citation =====
 +
 +Dido Solutions, Inc. and Jackrabbit Consulting, Inc., //Crucible Concept of Operations (ConOps)//, Version 1.0 Accepted, 6 June 2026.
 +
 +===== Reference Identifier =====
 +
 +[C2]
 +
 +===== Document Title =====
 +
 +Crucible Concept of Operations
 +
 +===== Document Type =====
 +
 +Concept of Operations
 +
 +===== Version =====
 +
 +Version 1.0
 +
 +===== Date =====
 +
 +6 June 2026
 +
 +===== Issuing Organizations =====
 +
 +  * Dido Solutions, Inc.
 +  * Jackrabbit Consulting, Inc.
 +
 +===== Description =====
 +
 +The Crucible Concept of Operations describes how Crucible is intended to operate.
 +
 +The document defines the Phase 1 operational concept in which the ''forge'' command-line utility runs non-interactively as one or more CI/CD pipeline steps. It describes baseline composition, Machine Image construction, dependency and compliance-finding capture, infrastructure deployment, connected-to-disconnected transfer, and compliance Evidence generation.
 +
 +The document also records the future Phase 2 web-management concept and the strategic, unscheduled direction toward increased native execution.
 +
 +The Concept of Operations contextualizes the [[dido:02-crusible:99-annexes:annex-b:cr-001|[C1] Crucible System Requirements Specification]] and remains subordinate to the System Requirements Specification and the Engineering Constitution. Where the Concept of Operations conflicts with an approved requirement, the approved requirement controls. :contentReference[oaicite:0]{index=0}
 +
 +===== Document Status =====
 +
 +Accepted
 +
 +The project owner accepted Version 1.0 on 6 June 2026.
 +
 +===== Operational Concepts =====
 +
 +The Concept of Operations addresses:
 +
 +  * Phase 1 command-line operation
 +  * CI/CD pipeline integration
 +  * Image-layer baseline composition
 +  * Infrastructure baseline composition
 +  * Optional application source
 +  * Machine Image construction
 +  * Dependency capture
 +  * Compliance-finding capture
 +  * Infrastructure deployment
 +  * Connected-to-disconnected transfer
 +  * Offline package-repository population
 +  * Compliance Evidence supporting SCTM, RMF, and ATO activities
 +  * Phase 2 web management
 +  * Strategic native execution
 +
 +===== Related Requirements =====
 +
 +The Concept of Operations provides operational context for:
 +
 +  * FR-BAS-001 through FR-BAS-004
 +  * FR-DSO-001 through FR-DSO-006
 +  * FR-DEPC-001 through FR-DEPC-005
 +  * FR-AG-001 through FR-AG-005
 +  * FR-COMP-008 through FR-COMP-010
 +  * FR-UI-001 through FR-UI-002
 +  * INT-001
 +  * INT-002
 +  * FUT-007 through FUT-009
 +
 +===== Related Architecture Decisions =====
 +
 +The Concept of Operations identifies relationships to:
 +
 +  * ADR-003, Baseline Composition
 +  * ADR-004, Dependency Capture and Offline Transfer
 +  * ADR-005, Operating-System-Agnostic Compliance Engine
 +  * ADR-006, Native Execution Strategy
 +  * ADR-007, Interface Phasing
 +
 +===== Related Documents =====
 +
 +  * [[dido:02-crusible:99-annexes:annex-b:cr-001|[C1] Crucible System Requirements Specification]]
 +  * [[dido:02-crusible:99-annexes:annex-c-requirements:start|Annex C: Requirements]]
 +
 +===== Citation Format =====
 +
 +Use the following link when citing this reference:
 +
 +<code dokuwiki>
 +[[dido:02-crusible:99-annexes:annex-b:cr-002:start|[C2]]]
 +</code>
 +
 +For a requirement ConOps Relationship section:
 +
 +<code dokuwiki>
 +===== ConOps Relationship =====
 +
 +The Crucible Concept of Operations describes this requirement as part of the Phase 1 CI/CD-embedded workflow [[dido:02-crusible:99-annexes:annex-b:cr-002:start|[C2]]].
 +</code>
 +
 +----
 +===== Notes for Editors =====
 +
 +Maintain this page as the stable citation target for the Crucible Concept of Operations.
 +
 +Update the version, date, document status, and citation when a new controlled revision supersedes Version 1.0.
 +
 +Preserve the reference identifier [C2] and the namespace ''cr-002''.
 +
 +Do not rename this page once it has been cited externally unless a redirect or move plan is in place.
 +
 +----
 +
 +<WRAP centeralign>
 +© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.
 +</WRAP>