Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
| dido:02-crusible:99-annexes:annex-b:cr-002 [2026/07/15 11:34] – removed - external edit (Unknown date) 127.0.0.1 | dido:02-crusible:99-annexes:annex-b:cr-002 [2026/07/20 07:07] (current) – ↷ Links adapted because of a move operation nick_dido | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| + | ====== C2 - Crucible Concept of Operations ====== | ||
| + | [[dido: | ||
| + | |||
| + | ===== Citation ===== | ||
| + | |||
| + | Dido Solutions, Inc. and Jackrabbit Consulting, Inc., //Crucible Concept of Operations (ConOps)//, Version 1.0 Accepted, 6 June 2026. | ||
| + | |||
| + | ===== Reference Identifier ===== | ||
| + | |||
| + | [C2] | ||
| + | |||
| + | ===== Document Title ===== | ||
| + | |||
| + | Crucible Concept of Operations | ||
| + | |||
| + | ===== Document Type ===== | ||
| + | |||
| + | Concept of Operations | ||
| + | |||
| + | ===== Version ===== | ||
| + | |||
| + | Version 1.0 | ||
| + | |||
| + | ===== Date ===== | ||
| + | |||
| + | 6 June 2026 | ||
| + | |||
| + | ===== Issuing Organizations ===== | ||
| + | |||
| + | * Dido Solutions, Inc. | ||
| + | * Jackrabbit Consulting, Inc. | ||
| + | |||
| + | ===== Description ===== | ||
| + | |||
| + | The Crucible Concept of Operations describes how Crucible is intended to operate. | ||
| + | |||
| + | The document defines the Phase 1 operational concept in which the '' | ||
| + | |||
| + | The document also records the future Phase 2 web-management concept and the strategic, unscheduled direction toward increased native execution. | ||
| + | |||
| + | The Concept of Operations contextualizes the [[dido: | ||
| + | |||
| + | ===== Document Status ===== | ||
| + | |||
| + | Accepted | ||
| + | |||
| + | The project owner accepted Version 1.0 on 6 June 2026. | ||
| + | |||
| + | ===== Operational Concepts ===== | ||
| + | |||
| + | The Concept of Operations addresses: | ||
| + | |||
| + | * Phase 1 command-line operation | ||
| + | * CI/CD pipeline integration | ||
| + | * Image-layer baseline composition | ||
| + | * Infrastructure baseline composition | ||
| + | * Optional application source | ||
| + | * Machine Image construction | ||
| + | * Dependency capture | ||
| + | * Compliance-finding capture | ||
| + | * Infrastructure deployment | ||
| + | * Connected-to-disconnected transfer | ||
| + | * Offline package-repository population | ||
| + | * Compliance Evidence supporting SCTM, RMF, and ATO activities | ||
| + | * Phase 2 web management | ||
| + | * Strategic native execution | ||
| + | |||
| + | ===== Related Requirements ===== | ||
| + | |||
| + | The Concept of Operations provides operational context for: | ||
| + | |||
| + | * FR-BAS-001 through FR-BAS-004 | ||
| + | * FR-DSO-001 through FR-DSO-006 | ||
| + | * FR-DEPC-001 through FR-DEPC-005 | ||
| + | * FR-AG-001 through FR-AG-005 | ||
| + | * FR-COMP-008 through FR-COMP-010 | ||
| + | * FR-UI-001 through FR-UI-002 | ||
| + | * INT-001 | ||
| + | * INT-002 | ||
| + | * FUT-007 through FUT-009 | ||
| + | |||
| + | ===== Related Architecture Decisions ===== | ||
| + | |||
| + | The Concept of Operations identifies relationships to: | ||
| + | |||
| + | * ADR-003, Baseline Composition | ||
| + | * ADR-004, Dependency Capture and Offline Transfer | ||
| + | * ADR-005, Operating-System-Agnostic Compliance Engine | ||
| + | * ADR-006, Native Execution Strategy | ||
| + | * ADR-007, Interface Phasing | ||
| + | |||
| + | ===== Related Documents ===== | ||
| + | |||
| + | * [[dido: | ||
| + | * [[dido: | ||
| + | |||
| + | ===== Citation Format ===== | ||
| + | |||
| + | Use the following link when citing this reference: | ||
| + | |||
| + | <code dokuwiki> | ||
| + | [[dido: | ||
| + | </ | ||
| + | |||
| + | For a requirement ConOps Relationship section: | ||
| + | |||
| + | <code dokuwiki> | ||
| + | ===== ConOps Relationship ===== | ||
| + | |||
| + | The Crucible Concept of Operations describes this requirement as part of the Phase 1 CI/ | ||
| + | </ | ||
| + | |||
| + | ---- | ||
| + | ===== Notes for Editors ===== | ||
| + | |||
| + | Maintain this page as the stable citation target for the Crucible Concept of Operations. | ||
| + | |||
| + | Update the version, date, document status, and citation when a new controlled revision supersedes Version 1.0. | ||
| + | |||
| + | Preserve the reference identifier [C2] and the namespace '' | ||
| + | |||
| + | Do not rename this page once it has been cited externally unless a redirect or move plan is in place. | ||
| + | |||
| + | ---- | ||
| + | |||
| + | <WRAP centeralign> | ||
| + | © 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc. | ||
| + | </ | ||