C2 - Crucible Concept of Operations
Citation
Dido Solutions, Inc. and Jackrabbit Consulting, Inc., Crucible Concept of Operations (ConOps), Version 1.0 Accepted, 6 June 2026.
Reference Identifier
[C2]
Document Title
Crucible Concept of Operations
Document Type
Concept of Operations
Version
Version 1.0
Date
6 June 2026
Issuing Organizations
-
Dido Solutions, Inc.
-
Jackrabbit Consulting, Inc.
Description
The Crucible Concept of Operations describes how Crucible is intended to operate.
The document defines the Phase 1 operational concept in which the forge command-line utility runs non-interactively as one or more CI/CD pipeline steps. It describes baseline composition, Machine Image construction, dependency and compliance-finding capture, infrastructure deployment, connected-to-disconnected transfer, and compliance Evidence generation.
The document also records the future Phase 2 web-management concept and the strategic, unscheduled direction toward increased native execution.
The Concept of Operations contextualizes the [C1] Crucible System Requirements Specification and remains subordinate to the System Requirements Specification and the Engineering Constitution. Where the Concept of Operations conflicts with an approved requirement, the approved requirement controls. :contentReference[oaicite:0]{index=0}
Document Status
Accepted
The project owner accepted Version 1.0 on 6 June 2026.
Operational Concepts
The Concept of Operations addresses:
-
Phase 1 command-line operation
-
CI/CD pipeline integration
-
Image-layer baseline composition
-
Infrastructure baseline composition
-
Optional application source
-
Machine Image construction
-
Dependency capture
-
Compliance-finding capture
-
Infrastructure deployment
-
Connected-to-disconnected transfer
-
Offline package-repository population
-
Compliance Evidence supporting SCTM, RMF, and ATO activities
-
Phase 2 web management
-
Strategic native execution
Related Requirements
The Concept of Operations provides operational context for:
-
FR-BAS-001 through FR-BAS-004
-
FR-DSO-001 through FR-DSO-006
-
FR-DEPC-001 through FR-DEPC-005
-
FR-AG-001 through FR-AG-005
-
FR-COMP-008 through FR-COMP-010
-
FR-UI-001 through FR-UI-002
-
INT-001
-
INT-002
-
FUT-007 through FUT-009
Related Architecture Decisions
The Concept of Operations identifies relationships to:
-
ADR-003, Baseline Composition
-
ADR-004, Dependency Capture and Offline Transfer
-
ADR-005, Operating-System-Agnostic Compliance Engine
-
ADR-006, Native Execution Strategy
-
ADR-007, Interface Phasing
Related Documents
Citation Format
Use the following link when citing this reference:
[[dido:02-crusible:99-annexes:annex-b:cr-002:start|[C2]]]
For a requirement ConOps Relationship section:
===== ConOps Relationship ===== The Crucible Concept of Operations describes this requirement as part of the Phase 1 CI/CD-embedded workflow [[dido:02-crusible:99-annexes:annex-b:cr-002:start|[C2]]].
Notes for Editors
Maintain this page as the stable citation target for the Crucible Concept of Operations.
Update the version, date, document status, and citation when a new controlled revision supersedes Version 1.0.
Preserve the reference identifier [C2] and the namespace cr-002.
Do not rename this page once it has been cited externally unless a redirect or move plan is in place.
© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.