Show pageOld revisionsBacklinksAdd to bookExport to PDFODT exportBack to top This page is read only. You can view the source, but not change it. Ask your administrator if you think this is wrong. ====== C2 - Crucible Concept of Operations ====== [[dido:02-crusible:99-annexes:annex-b:start|Go to Annex B: References]] ===== Citation ===== Dido Solutions, Inc. and Jackrabbit Consulting, Inc., //Crucible Concept of Operations (ConOps)//, Version 1.0 Accepted, 6 June 2026. ===== Reference Identifier ===== [C2] ===== Document Title ===== Crucible Concept of Operations ===== Document Type ===== Concept of Operations ===== Version ===== Version 1.0 ===== Date ===== 6 June 2026 ===== Issuing Organizations ===== * Dido Solutions, Inc. * Jackrabbit Consulting, Inc. ===== Description ===== The Crucible Concept of Operations describes how Crucible is intended to operate. The document defines the Phase 1 operational concept in which the ''forge'' command-line utility runs non-interactively as one or more CI/CD pipeline steps. It describes baseline composition, Machine Image construction, dependency and compliance-finding capture, infrastructure deployment, connected-to-disconnected transfer, and compliance Evidence generation. The document also records the future Phase 2 web-management concept and the strategic, unscheduled direction toward increased native execution. The Concept of Operations contextualizes the [[dido:02-crusible:99-annexes:annex-b:cr-001|[C1] Crucible System Requirements Specification]] and remains subordinate to the System Requirements Specification and the Engineering Constitution. Where the Concept of Operations conflicts with an approved requirement, the approved requirement controls. :contentReference[oaicite:0]{index=0} ===== Document Status ===== Accepted The project owner accepted Version 1.0 on 6 June 2026. ===== Operational Concepts ===== The Concept of Operations addresses: * Phase 1 command-line operation * CI/CD pipeline integration * Image-layer baseline composition * Infrastructure baseline composition * Optional application source * Machine Image construction * Dependency capture * Compliance-finding capture * Infrastructure deployment * Connected-to-disconnected transfer * Offline package-repository population * Compliance Evidence supporting SCTM, RMF, and ATO activities * Phase 2 web management * Strategic native execution ===== Related Requirements ===== The Concept of Operations provides operational context for: * FR-BAS-001 through FR-BAS-004 * FR-DSO-001 through FR-DSO-006 * FR-DEPC-001 through FR-DEPC-005 * FR-AG-001 through FR-AG-005 * FR-COMP-008 through FR-COMP-010 * FR-UI-001 through FR-UI-002 * INT-001 * INT-002 * FUT-007 through FUT-009 ===== Related Architecture Decisions ===== The Concept of Operations identifies relationships to: * ADR-003, Baseline Composition * ADR-004, Dependency Capture and Offline Transfer * ADR-005, Operating-System-Agnostic Compliance Engine * ADR-006, Native Execution Strategy * ADR-007, Interface Phasing ===== Related Documents ===== * [[dido:02-crusible:99-annexes:annex-b:cr-001|[C1] Crucible System Requirements Specification]] * [[dido:02-crusible:99-annexes:annex-c-requirements:start|Annex C: Requirements]] ===== Citation Format ===== Use the following link when citing this reference: <code dokuwiki> [[dido:02-crusible:99-annexes:annex-b:cr-002:start|[C2]]] </code> For a requirement ConOps Relationship section: <code dokuwiki> ===== ConOps Relationship ===== The Crucible Concept of Operations describes this requirement as part of the Phase 1 CI/CD-embedded workflow [[dido:02-crusible:99-annexes:annex-b:cr-002:start|[C2]]]. </code> ---- ===== Notes for Editors ===== Maintain this page as the stable citation target for the Crucible Concept of Operations. Update the version, date, document status, and citation when a new controlled revision supersedes Version 1.0. Preserve the reference identifier [C2] and the namespace ''cr-002''. Do not rename this page once it has been cited externally unless a redirect or move plan is in place. ---- <WRAP centeralign> © 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc. </WRAP> dido/02-crusible/99-annexes/annex-b/cr-002.txt Last modified: 2026/07/20 07:07by nick_dido