Crucible SHALL designate the initial Infrastructure Deployment of an Infrastructure Environment as the first stage of its associated Operational Lifecycle revision.
This requirement derives from:
The Original Requirement states:
The system SHALL support infrastructure lifecycle management from initial deployment through retirement.[C1]
MO-006b preserves the lifecycle-initiation boundary expressed by from initial deployment in the Original Requirement by identifying the initial Infrastructure Deployment as the first stage of the associated Operational Lifecycle revision.
The separate requirements derived from MO-006 address:
The initial Infrastructure Deployment first realizes an Infrastructure Environment.
Designating the initial Infrastructure Deployment as the first stage of the associated Operational Lifecycle revision establishes the point at which management of the realized Infrastructure Environment begins.
The initial Infrastructure Deployment can include:
Lifecycle initiation supports:
Pre-deployment planning, design, approval, and preparation may precede the Operational Lifecycle of the realized Infrastructure Environment.
A subsequent deployment does not automatically initiate a new Operational Lifecycle. The governing Operational Lifecycle revision determines whether the deployment represents maintenance, restoration, replacement, recreation, or creation of a new Infrastructure Environment.
This requirement does not associate the Operational Lifecycle revision with the Infrastructure Environment. MO-006a addresses that association.
This requirement does not record the current lifecycle state after initiation. MO-006c addresses lifecycle-state recording.
This requirement does not execute lifecycle transitions following initiation. MO-006d addresses transition execution.
This requirement does not retire the Infrastructure Environment. MO-006e addresses Retirement.
This requirement applies to:
Verification confirms that:
The following pages reference this requirement:
Implemented and Verified.
Assess whether the current Crucible implementation designates the initial Infrastructure Deployment of an Infrastructure Environment as the first stage of its associated Operational Lifecycle revision.
Review and accept MO-006b as a proposed derived requirement created from the evaluation and decomposition of MO-006 in the Crucible System Requirements Specification, Version 1.1 Draft.
The following unresolved issues affect this requirement:
Define the criteria used to identify the initial Infrastructure Deployment of an Infrastructure Environment.
Define the event at which the initial Infrastructure Deployment first realizes the Infrastructure Environment.
Define the first stage of each Operational Lifecycle revision that may govern an Infrastructure Environment.
Identify the authority or process responsible for designating the initial Infrastructure Deployment as the first lifecycle stage.
Define whether pre-deployment planning, approval, and preparation belong to a separate lifecycle or process.
Define when a subsequent deployment creates a new Infrastructure Environment and initiates a new Operational Lifecycle.
This requirement page should retain the stable requirement identifier MO-006b.
This page is a leaf requirement page and omits a trailing :start from its namespace.
The parent MO-006 page is a non-leaf page and retains a trailing :start in its namespace.
Changes to the Statement should preserve:
The lifecycle-initiation record should identify:
Material changes should receive review and should update the verification criteria, source records, and Issues section.
To reference this requirement Statement from another wiki page, insert:
{{section>dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-006:mo-006b#Statement&noheader&nofooter&noeditbtn}}
Do not rename this page after an external citation unless a redirect or move plan is in place.
© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.