public:00-sip-ra:06-specific-requirements-on-proposals:06-4-required-submission-content:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
public:00-sip-ra:06-specific-requirements-on-proposals:06-4-required-submission-content:start [2026/09/14 18:10] – nick_didopublic:00-sip-ra:06-specific-requirements-on-proposals:06-4-required-submission-content:start [2026/09/14 18:17] (current) – nick_dido
Line 7: Line 7:
 ===== Requirements ===== ===== Requirements =====
  
-  * **[[public:00-sip-ra:99-annexes:annex-c-requirements:sip-042-complete-reference-architecture-specification|SIP-042 — Complete Reference Architecture Specification]]:** The Submission SHALL include a complete specification of the proposed Reference Architecture that addresses all applicable requirements defined in [[public:00-sip-ra:06-specific-requirements-on-proposals:06-2-scope-of-proposals-sought:start|Section 6.2 Scope of Proposals Sought]] and [[public:00-sip-ra:06-specific-requirements-on-proposals:06-3-relationship-to-other-omg-specifications:start|Section 6.3 Relationship to Other OMG Specifications]] +^ Requirement ^ Statement ^ 
- +| [[public:00-sip-ra:99-annexes:annex-c-requirements:sip-042-complete-reference-architecture-specification|SIP-042 — Complete Reference Architecture Specification]] | {{section>public:00-sip-ra:99-annexes:annex-c-requirements:sip-042-complete-reference-architecture-specification#Statement&noheader&nofooter&noeditbtn}} | 
-  * **[[public:00-sip-ra:99-annexes:annex-c-requirements:sip-043-integrated-submission-document|SIP-043 — Integrated Submission Document]]:** The specification MAY be submitted as a single integrated document+| [[public:00-sip-ra:99-annexes:annex-c-requirements:sip-043-integrated-submission-document|SIP-043 — Integrated Submission Document]] | {{section>public:00-sip-ra:99-annexes:annex-c-requirements:sip-043-integrated-submission-document#Statement&noheader&nofooter&noeditbtn}} |
  
 This page identifies the subsections for Required Submission Content. This page identifies the subsections for Required Submission Content.
Line 17: Line 17:
 ===== Notes for Editors ===== ===== Notes for Editors =====
  
-The links in this section provide temporary access to the individual Annex C requirement pages while those records are being created and reviewed.+The requirement identifiers and short titles link to the authoritative requirement records in Annex C. 
 + 
 +The Statements displayed in this section are transcluded from the corresponding Annex C requirement pages and are not independently maintained copies.
  
-After the Annex C records are complete, replace each locally maintained Statement with a transclusion of the authoritative Statement from its corresponding requirement page.+Make changes to a Statement on its Annex C requirement page.
  
 SIP-042 establishes the required completeness of the submitted specification. SIP-043 permits the specification to be organized as one integrated document but does not require that document organization. SIP-042 establishes the required completeness of the submitted specification. SIP-043 permits the specification to be organized as one integrated document but does not require that document organization.
  • public/00-sip-ra/06-specific-requirements-on-proposals/06-4-required-submission-content/start.1789434630.txt.gz
  • Last modified: 2026/09/14 18:10
  • by nick_dido