Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
| public:00-sip-ra:06-specific-requirements-on-proposals:06-4-required-submission-content:06-4-5-governance-and-authority:start [2026/09/14 18:46] – nick_dido | public:00-sip-ra:06-specific-requirements-on-proposals:06-4-required-submission-content:06-4-5-governance-and-authority:start [2026/09/14 18:48] (current) – [Requirement] nick_dido | ||
|---|---|---|---|
| Line 7: | Line 7: | ||
| ===== Requirement ===== | ===== Requirement ===== | ||
| - | * **[[public: | + | ^ Requirement ^ Statement ^ |
| + | | [[public: | ||
| ===== Required Coverage ===== | ===== Required Coverage ===== | ||
| Line 27: | Line 27: | ||
| After the record is complete, replace the locally maintained Statement with a transclusion of its authoritative Statement. | After the record is complete, replace the locally maintained Statement with a transclusion of its authoritative Statement. | ||
| - | SIP-010 through SIP-012 govern the underlying Artifact lifecycles. SIP-014 and SIP-015 govern jurisdictional control. SIP-049 requires the general architectural-concern and lifecycle description. | + | SIP-010 through SIP-012 govern the underlying Artifact lifecycles. SIP-014 and SIP-015 govern jurisdictional control. SIP-049 requires the general architectural concern and lifecycle description. |
| SIP-053 brings those requirements together as a required Governance and jurisdictional Authority description without replacing or renumbering their authoritative requirements. | SIP-053 brings those requirements together as a required Governance and jurisdictional Authority description without replacing or renumbering their authoritative requirements. | ||