Show pageOld revisionsBacklinksAdd to bookExport to PDFODT exportBack to top This page is read only. You can view the source, but not change it. Ask your administrator if you think this is wrong. ====== P4-REQ-21-3-009 ====== [[dido:99_annexes:annex-d-requirements:part-04:start| Return to Requirements]] ===== Statement ===== The Phase 0 technology selections SHALL NOT redefine the conceptual architecture, logical architecture, or FX Demo Logical Profile. ===== Source ===== Part 4, Section 21.3: Technology Selection Requirements. ===== Rationale ===== Phase 0 technologies are implementation mechanisms selected to realise architectural elements defined by Parts 1, 2, and 3. Allowing those technologies to redefine architectural meaning would collapse the separation between architecture and implementation. This constraint preserves the authority of the conceptual, logical, and FX logical architectural layers regardless of the technologies selected for Phase 0. ===== Applies To ===== This requirement applies to: * DDS; * IDL; * QoS profiles; * generated types; * Python; * scripts; * repository organisation; and * other Phase 0 implementation technologies or mechanisms. ===== Verification ===== Verification SHALL confirm that Phase 0 technology selections realise rather than redefine architectural elements. Verification activities should include review checks confirming that: * DDS Topics remain implementations of logical Communication Endpoints; * IDL structures remain implementations of logical information structures; * generated types remain derived implementation artefacts; * repository and script structures remain implementation concerns; and * technology-specific decisions do not alter conceptual or logical meaning. ===== Traceability ===== This requirement preserves the separation between the Part 1 Conceptual Architecture, Part 2 Logical Architecture, Part 3 FX Demo Logical Profile, and Part 4 technology selections. Related requirement identifiers: * [[dido:99_annexes:annex-d-requirements:part-04:p4-req-21-3-002]] * [[dido:99_annexes:annex-d-requirements:part-04:p4-req-21-3-003]] * [[dido:99_annexes:annex-d-requirements:part-04:p4-req-21-3-004]] * [[dido:99_annexes:annex-d-requirements:part-04:p4-req-21-3-005]] * [[dido:99_annexes:annex-d-requirements:part-04:p4-req-21-3-010]] Related source section: * [[fxdemo:04-part:21-phase-0-implementation-requirements:21-3-technology-selection-requirements:start]] ===== Status ===== Draft ---- <WRAP centeralign> © 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc. </WRAP> dido/99_annexes/annex-d-requirements/part-04/p4-req-21-3-009.txt Last modified: 2026/08/06 16:01by owen