Show pageOld revisionsBacklinksAdd to bookExport to PDFODT exportBack to top Backlinks This is a list of pages that seem to link back to the current page. 1.1 Purpose1.2 Scope1.3 Intended Audience1. Introduction2.1 Operational Need2.2 Mission and Expected Outcomes2. Operational Need and Mission3.1 Connectivity Conditions3.2 Deployment Environments3. Operational Environment4.1 Human Actors5.1 Select and Compose Baselines5.2 Construct Images5.3 Capture and Preserve Dependencies5.4 Assess Compliance5.5 Deploy the Environment5.6 Validate the Result5.7 Preserve Evidence and Lifecycle Records5. Operational Concept6.2 Deploy in a Connected EnvironmentMO-001a — Infrastructure Environment CreationMO-001b — Deployment DurationMO-001c — ReproducibilityMO-001d — Security Baseline ConformanceMO-001e — Compliance Baseline ConformanceMO-002a — Maximum Platform Deployment DurationMO-002b — Platform Deployment Duration ReductionMO-003a — Cross-Platform DeploymentMO-003b — Provider-Independent Crucible DescriptionMO-003c — Provider-Independent Infrastructure BaselineMO-003d — Limitation of Provider-Specific DependenciesMO-004a — Connected Environment OperationsMO-004b — Disconnected Environment OperationsMO-004c — Authorized Resource UseMO-004d — Disconnected Resource AvailabilityMO-005a — Infrastructure Baseline Artifact ManagementMO-005b — Infrastructure Baseline IdentificationMO-005c — Infrastructure Baseline Revision ControlMO-005d — Approved Infrastructure Baseline SelectionMO-005e — Infrastructure Baseline ReuseMO-005f — Approved Infrastructure Baseline PreservationMO-005g — Infrastructure Deployment Baseline TraceabilityMO-006a — Operational Lifecycle AssociationMO-006b — Infrastructure Lifecycle InitiationMO-006c — Infrastructure Lifecycle State RecordingMO-006d — Infrastructure Lifecycle Transition ExecutionMO-006e — Infrastructure Environment RetirementOR-001a — Developer OperationsOR-001b — DevSecOps Engineer OperationsOR-001c — Platform Engineer OperationsOR-001d — System Administrator OperationsOR-001e — Security Engineer OperationsOR-001f — Compliance Officer OperationsOR-002c — Deployment Acceptance RecordOR-003a — Classified Environment OperationsOR-003b — Unclassified Environment OperationsFR-CFG-002 — Infrastructure as CodeC.3.1 Configuration ManagementC.3.2 Image ManagementC.3.5 Air-Gapped OperationsC.3.6 Compliance ManagementC.3.8 DevSecOps IntegrationC.3.10 Dependency Capture and Offline TransferCrucibleMO-001 — Governed Distributed Test EnvironmentsMO-002a — Reproducible Test EnvironmentsMO-002b — Reproducible Test ExecutionMO-003 — Automated Test ExecutionMO-004a — DIDO Baseline ComparisonMO-004b — Validation Decision Based on DIDO Baseline ComparisonMO-004 — DIDO Baseline Comparison and ValidationMO-005 — Comparative Evaluation of Candidate SolutionsMO-009b — Test Resource ControlNOD-003 — Configure a NodeActorAuthorization to Operate (ATO)AuthorityCandidate SolutionCatalogCatalog EntryCommunity of InterestComplianceConfiguration ManagementConfiguration SourceContainer MirrorControlled InputCostDependency RecordDeployment TargetDeployment Target CatalogEnergy ConsumptionEvaluation CharacteristicException HandlingExecution FacilityExecutable InstructionExecutable InstructionExecution PathExpected ResultFunctional CorrectnessFX Command AcknowledgementFX Control CommandFX Node StatusFX Provenance RecordFX Replay RequestFX Replay ResultFX Transaction RecordGitGit Operations (GitOps)Governance PolicyGovernedHardened ImageImage BuildImage CatalogImage LayerImage PromotionImage ProvenanceImage SigningIncomplete Test RunIntegrityInventoryLogical Audit and Provenance PlaneMaintainabilityOperational ResourceOperational StabilityOrganizationPerformance EfficiencyPolicyPull LockPQuality CharacteristicRecoverabilityRegistryReliabilityRepositoryRequirementResourceResource ConsumptionRoleScalabilitySecurity Control Traceability Matrix (SCTM)SecuritySequenced Test ObjectSequence StepSoftware Supply ChainStarting ConditionStorage ConsumptionSupply-Chain CaptureSupply-Chain IntegrityTest ArgumentTest Argument ValueTest CaseTest DefinitionTest ExecutableTest ExecutionTest Execution ExceptionTest Execution Exception TypeTest ItemTest ObjectTest ResultTest RunTest Run StateTest Run Termination ReasonTest SetTest StepTimeoutTiming ConditionTransfer BundleUserValidationValidation CriteriaValidation DecisionVerdictVersionVersion PinningIntroduction19.4 Implementation Artefacts Prepared for Testability19.6 Implementation Artefacts Prepared for Evidence19.8 Relationship to Deployment, Testability, and Evidence Plan Summary9.4 Data Plane Type Definitions12.1 Purpose of the Data Plane in Phase 012.6 Data Plane Validation dido/99_annexes/annex-b-terms-and-definitions/p/provenance.txt Last modified: 2026/07/18 12:33by 127.0.0.1