Show pageOld revisionsBacklinksAdd to bookExport to PDFODT exportBack to top Backlinks This is a list of pages that seem to link back to the current page. Architectural ElementCData PlaneFX Command AcknowledgementFX Control CommandFX Control Command EndpointFX Health and Observability NodeFX Node StatusFX Node Status EndpointFX Registry and Coordination NodeFX Replay and Reconstruction NodeFX Replay RequestFX Replay Request EndpointHealth Reporting RoleRegistry and Coordination RoleReplay and Reconstruction RoleRuntime PlaneP1-REQ-13-5-001P1-REQ-13-5-0023.3 Coverage of the Original FX Demo Reference Architecture8.1 Overview8.2 Control Plane8.7 Cross-Plane Relationships13.5 Runtime Plane RequirementsIntroductionForeword1.1 Purpose of the Handbook1.2 Scope of Phase 01.3 Intended Audience1.4 How to Use This Handbook2.3 Relationship to FDIS-RA3.2 Logical Architecture Baseline4.3 Source Directories4.7 Test Directories5.6 Docker / Container Environment7.1 General Naming Principles7.3 Source File Naming7.7 Topic Naming7.8 Node Naming7.11 Spelling, Grammar, and Style9.1 Role of IDL in Phase 09.2 IDL Source Location9.3 Control Plane Type Definitions9.4 Data Plane Type Definitions10.1 Purpose of the Node Pattern10.2 Node Lifecycle10.3 Node Startup Behavior10.4 Node Runtime Behavior10.6 Node Status Reporting10.7 Node Command Handling11.1 Purpose of the Control Plane11.4 Control Plane Message Semantics11.5 Control Plane QoS Expectations11.6 Control Plane Validation11.7 Control Plane Observability11. Control Plane Topics12.1 Purpose of the Data Plane in Phase 012.3 FX Demo Data Topics12. Data Plane Topics13.9 runAll.sh14.5 Container Networking14.7 Container Logs15.1 Purpose of Logging15.4 Node Logs15.7 Control Plane Observation15.8 Evidence Collection16.1 Purpose of Exception Handling Rules16.2 Node Exceptions16.7 Recoverable and Non-Recoverable Errors16.8 Error Reporting18.5 Control Plane Acceptance Criteria18.6 Data Plane Acceptance Criteria18.9 Evidence Acceptance Criteria18.10 Phase 0 Completion Criteria19.5 Full IEF Policy Enforcement19.6 Full Operational Dashboard20.7 September 2026 Demo Dependencies20.10 Risk Review and Baseline Acceptance dido/99_annexes/annex-b-terms-and-definitions/c/control_plane.txt Last modified: 2026/08/04 07:09(external edit)