This is an old revision of the document!
MO-002 — Reduced Platform Deployment Timelines
Original Requirement
Crucible SHALL reduce platform deployment timelines from months to days or hours through automation.[C2]
Assessment of Original Requirement
The Original Requirement preserves the approved mission objective but does not express independently testable normative statements.
The following Specification Discipline and Authoring findings apply:
-
Reduce requires comparison with an identified and approved baseline, but the Original Requirement does not identify the baseline process, duration, scope, inputs, or measurement method
-
Platform deployment timelines does not identify the starting event, completion event, measured activities, or measurement boundaries
-
From months does not identify a specific baseline duration or a bounded range
-
To days or hours provides alternative and unbounded target ranges rather than a single applicable Acceptance Criterion
-
Through automation prescribes an implementation approach rather than stating only the required outcome
-
The Original Requirement does not identify the applicable Platform Deployment
-
The Original Requirement does not identify which Platform Deployment activities contribute to the measured Deployment Duration
-
The Original Requirement does not identify how failed, incomplete, interrupted, or repeated deployments affect the measured result
-
The Original Requirement combines an absolute duration objective, a relative duration-reduction objective, and an implementation approach within one compound normative statement
-
The absolute duration objective and relative duration-reduction objective may pass or fail independently
-
The Original Requirement does not provide independently identifiable statements for verification and traceability
The Original Requirement therefore requires decomposition into independently identifiable normative requirements.
The decomposition preserves MO-002 as the stable parent requirement identifier. Each replacement requirement receives a lettered identifier and a separate requirement page. The source page currently combines the maximum permitted duration and improvement over an approved Deployment Baseline in one normalized Statement, so those outcomes also require separation. :contentReference[oaicite:0]{index=0}
Proposed Statements
The Original Requirement is replaced by the following independently identifiable normative requirements:
© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.