The DIDO-TE SHALL control each introduced Fault using the governing Test Procedure.
Control of an introduced Fault maintains its timing, duration, intensity, scope, and effects within the conditions specified by the governing Test Definition.
Fault control begins when the DIDO-TE introduces the Fault and continues until the Fault terminates or the governing Test Procedure completes the required containment or removal actions.
The DIDO-TE observes the introduced Fault separately from the Node response. This distinction allows the DIDO-TE to determine whether a difference in Node behaviour results from the specified Fault, an incorrectly introduced Fault, or another condition.
Control actions include maintaining, varying, restricting, suspending, resuming, containing, or terminating the Fault. The governing Test Procedure identifies which actions the DIDO-TE performs and the conditions that initiate each action.
An unexpected expansion, persistence, interruption, reduction, or intensification of the Fault constitutes a Test Execution Exception. The DIDO-TE contains such a condition before it affects targets outside the authorized scope.
Verification confirms that:
The following pages reference this requirement:
Assign the delivery phase.
Assign the implementation status.
The proposed derived requirement requires review and acceptance.
Assign the source requirement identifier and obligation from the DIDO-TE Requirements Register.
{{section>dido:03-dido-te:99-annexes:annex-c-requirements:03-node-requirements:nod-010-inject-node-faults:nod-010e-control-a-node-fault#Statement&noheader&nofooter&noeditbtn}}
© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.