Table of Contents

NOD-005e — Control Node Execution

Go to NOD-005 — Execute a Node

Statement

The DIDO-TE SHALL control the execution of each Node in accordance with the applicable Test Definition.

Derived From

Rationale

Execution control maintains Node activity within the scope, sequence, timing, parameters, resource constraints, and operating conditions established for Test Execution.

Execution control includes coordinating Node activity, applying control instructions, maintaining required Node states and Node Bindings, regulating access to Test Resources, and responding to observed conditions.

The DIDO-TE distinguishes execution control from Node lifecycle control. Execution control governs the Node activity performed during Test Execution. Lifecycle control governs the Node state and transitions that permit, suspend, resume, or terminate that activity.

A control action that changes the execution of a Node requires an identified basis, target, initiating authority, procedure, expected effect, and resulting status. Uncontrolled or conflicting actions may invalidate Test Results or place the Node and Test Environment in an unknown state.

Applies To

Verification

Verification confirms that:

Verification includes:

Referenced By

Delivery Phase

Assign the applicable delivery phase.

Requirement Status

Draft

Statement Reference

Use the following syntax to reference this requirement’s Statement section from another DokuWiki page:

{{section>dido:03-dido-te:99-annexes:annex-c-requirements:03-node-requirements:nod-005-execute-a-node:nod-005e-control-node-execution#Statement&noheader&nofooter&noeditbtn}}

© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.