The DIDO-TE uniquely identifies each Node subject to execution control.
-
The DIDO-TE identifies the applicable Test Definition and Test Execution.
-
The DIDO-TE controls Node execution within the permitted activity, sequence, timing, parameters, constraints, and validity period.
-
The DIDO-TE uses identified and approved execution-control procedures.
-
Each control action identifies its initiating authority, target Node, basis, procedure, parameters, time, and expected effect.
-
The DIDO-TE verifies each applicable precondition before applying a control action.
-
The DIDO-TE coordinates Node activity with affected Nodes, Node Bindings, Dependencies, and Test Resources.
-
The DIDO-TE applies control actions in the sequence and at the time or event specified by the Test Definition.
-
The DIDO-TE prevents a missing, unauthorized, duplicate, conflicting, stale, ambiguous, or out-of-sequence control action.
-
The DIDO-TE verifies that each control action reaches the intended Node.
-
The DIDO-TE observes and records the actual effect of each material control action.
-
The DIDO-TE detects a difference between the intended and actual effect of a control action.
-
The DIDO-TE detects Node activity outside the applicable execution parameters or operating constraints.
-
The DIDO-TE detects an unexpected change to the Node Configuration, Node Binding, lifecycle state, resource use, or operating condition.
-
The DIDO-TE suspends, resumes, limits, isolates, or terminates Node activity only through an identified and approved procedure.
-
The DIDO-TE maintains the required Node lifecycle state and readiness conditions throughout execution.
-
The DIDO-TE prevents a Node that becomes invalid, unready, unavailable, degraded, unresponsive, or incorrectly configured from continuing execution.
-
The DIDO-TE identifies and handles each condition that constitutes a Test Execution Exception.
-
The DIDO-TE determines the effect of each material control action or deviation on affected Test Inputs, observations, Test Resources, Test Results, and Evidence.
-
The DIDO-TE records each control action, initiating authority, target Node, basis, procedure, parameters, timing, intended effect, actual effect, findings, exceptions, and resulting status.
-
Repeated application of an equivalent control action under equivalent conditions produces an equivalent effect within specified tolerances.
-
The DIDO-TE maintains Traceability among the Test Definition, Test Execution, Node, Node Configuration, Node Bindings, Test Inputs, Test Resources, control actions, observations, exceptions, Test Results, and resulting Evidence.
-
An unauthorized, uncontrolled, incorrectly sequenced, ineffective, ambiguous, or untraceable execution-control action constitutes nonconformance with this requirement.
-
Inspection of execution-control criteria and procedures
-
Inspection of control-action authorities, targets, parameters, timing, and expected effects
-
Observation of coordinated Node execution
-
Observation of an execution-control action and its actual effect
-
Confirmation that unauthorized, duplicate, conflicting, and out-of-sequence control actions are prevented
-
A negative assessment involving a control action sent to the wrong Node
-
A negative assessment involving a difference between the intended and actual effect
-
A negative assessment involving a Node that becomes unready or degraded
-
Confirmation that an unsuitable Node cannot continue execution
-
Inspection of control records, observations, exceptions, Test Results, Evidence, and Traceability