The DIDO-TE uniquely identifies the Node before starting it.
-
The DIDO-TE confirms that the Node occupies a permitted initial state.
-
The DIDO-TE uses an identified and authorized start procedure.
-
The start operation identifies the initiating authority, target Node, start parameters, applicable preconditions, and intended resulting state.
-
The DIDO-TE verifies each mandatory start precondition before initiating the start operation.
-
The DIDO-TE verifies the availability of each Dependency, Node Binding, service, and Test Resource required during startup.
-
The DIDO-TE starts dependent Nodes and services in the required sequence.
-
The DIDO-TE applies the Node Configuration and startup parameters associated with the authorized start operation.
-
The DIDO-TE prevents duplicate, conflicting, unauthorized, or out-of-sequence start operations.
-
The DIDO-TE observes the Node during the start operation.
-
The DIDO-TE detects an unsuccessful, incomplete, interrupted, stalled, or timed-out start operation.
-
The DIDO-TE detects an unexpected process, service, connection, Node Binding, error, or state transition during startup.
-
The DIDO-TE confirms the actual Node state after the start operation.
-
The DIDO-TE distinguishes completion of the start operation from confirmation of Node readiness.
-
An unsuccessful start leaves the Node in a known state or identifies the resulting state and required recovery action.
-
The DIDO-TE prevents a Node with an unsuccessful, incomplete, unauthorized, or ambiguous start result from participating in Test Execution.
-
The DIDO-TE records the Node identity, initiating authority, start procedure, parameters, source state, operations, timing, actual resulting state, findings, exceptions, and recovery actions.
-
Repeated authorized starts from equivalent initial conditions produce equivalent resulting states within specified tolerances.
-
The DIDO-TE maintains Traceability among the Node Definition, Node Implementation, Node Configuration, Node Bindings, Dependencies, start procedure, start activity, resulting state, findings, exceptions, and resulting Evidence.
-
An incorrect, incomplete, unsuccessful, unauthorized, ambiguous, or untraceable start operation constitutes nonconformance with this requirement.
-
Inspection of the Node identity and initial state
-
Inspection of the authorized start procedure and responsible authority
-
Inspection of start preconditions, parameters, Dependencies, Node Bindings, services, and Test Resources
-
Observation of the start sequence
-
Observation of the Node during startup
-
Confirmation of the actual resulting Node state
-
A negative assessment involving an unauthorized start
-
A negative assessment involving an unavailable mandatory Dependency
-
A negative assessment involving an interrupted or timed-out start
-
Confirmation that an unsuccessful start prevents Test Execution
-
Confirmation that startup completion does not automatically establish Node readiness
-
Inspection of start records, findings, exceptions, recovery actions, Evidence, and Traceability