NOD-004b — Start the Node

Go to NOD-004 — Control the Node Lifecycle

Statement

The DIDO-TE SHALL start each Node through an identified and authorized lifecycle procedure.

Derived From

Rationale

Starting a Node moves it from an established initial state into an operating state from which the DIDO-TE determines readiness for participation in a Test Environment.

A controlled start operation applies the sequence, parameters, dependencies, authorities, time constraints, and environmental conditions specified by the Node Definition, Node Implementation, Node Configuration, and applicable Test Definition.

Starting a Node does not by itself establish Node readiness. The start operation establishes the operating condition that NOD-004c evaluates before the Node participates in Test Execution.

An uncontrolled, incomplete, unauthorized, duplicate, or out-of-sequence start may produce an unknown Node state, activate unintended services or connections, disrupt dependent Nodes, or compromise Test Environment isolation.

Applies To

Verification

Verification confirms that:

Verification includes:

Referenced By

Delivery Phase

Assign the applicable delivery phase.

Requirement Status

Draft

Statement Reference

Use the following syntax to reference this requirement’s Statement section from another DokuWiki page:

{{section>dido:03-dido-te:99-annexes:annex-c-requirements:03-node-requirements:nod-004-control-the-node-lifecycle:nod-004b-start-the-node#Statement&noheader&nofooter&noeditbtn}}