Table of Contents

FR-BAS-003 — Process Predeployment and Postdeployment Steps

Go to C.3.9 Baseline Composition and Workspace

Statement

Crucible SHALL process predeployment and postdeployment steps.

Derived From

This requirement derives from:

The Original Requirement states:

The system shall process predeployment and postdeployment steps.[C1]

FR-BAS-003:

No other substantive normalization is required.

Rationale

Predeployment steps perform activities required before a Deployment Operation begins.

Postdeployment steps perform activities required after a Deployment Operation completes.

These steps allow a Workspace execution to coordinate activities that occur immediately before and after deployment without embedding those activities into the Deployment Operation itself.

Predeployment steps can include:

Postdeployment steps can include:

This requirement establishes processing of predeployment and postdeployment steps without prescribing:

Separate requirements, architecture specifications, Workflow definitions, and deployment profiles govern those subjects and behaviors.

Applies To

This requirement applies to:

Verification

Verification confirms that:

  1. A Workspace execution containing at least one predeployment step and at least one postdeployment step is selected for testing
  2. Crucible processes the selected predeployment step before the associated Deployment Operation
  3. Crucible processes the associated Deployment Operation
  4. Crucible processes the selected postdeployment step after the associated Deployment Operation
  5. The result of each processed step can be identified
  6. The observed execution order distinguishes the predeployment and postdeployment steps

Referenced By

The following pages reference this requirement:

Implementation Status

Implemented and Verified

Requirement Status

Review and approve FR-BAS-003 as a leaf requirement.


Issues

Determine whether Predeployment Step and Postdeployment Step require controlled definitions in the shared Terms and Definitions corpus.

Determine whether separate requirements define the representation, ordering, inputs, outputs, and status of deployment-related steps.

Determine whether separate requirements govern step failure handling, retry behavior, rollback, and continuation.


Notes for Editors

This requirement page retains the stable requirement identifier FR-BAS-003.

This page is a leaf requirement page and omits a trailing :start from its namespace.

The Statement addresses processing of both predeployment and postdeployment steps.

Predeployment steps execute before the associated Deployment Operation. Postdeployment steps execute after the associated Deployment Operation.

FR-BAS-001 governs consumption of Baseline Repositories from a Workspace.

FR-BAS-002 governs composition of selected Baselines.

FR-BAS-004 governs noninteractive Workspace execution.

Do not add particular deployment-related steps, execution engines, scripting languages, ordering rules, failure-handling behavior, rollback behavior, or validation obligations unless the controlling requirement changes through an approved requirements process.

To reference this requirement Statement from another wiki page, insert:

{{section>dido:02-crusible:99-annexes:annex-c-requirements:03-functional-requirements:03-09-baseline-composition-and-workspace:fr-bas-003#Statement&noheader&nofooter&noeditbtn}}

© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.