Crucible SHALL execute each Operational Lifecycle transition allocated to Crucible when its transition conditions are satisfied.
This requirement derives from:
The Original Requirement states:
The system SHALL support infrastructure lifecycle management from initial deployment through retirement.[C1]
MO-006d preserves the lifecycle-management intent of the Original Requirement by requiring Crucible to execute the Operational Lifecycle transitions allocated to it.
The separate requirements derived from MO-006 address:
An Operational Lifecycle transition changes an Infrastructure Environment from one lifecycle state to another.
An Operational Lifecycle revision defines:
Transition allocation prevents this requirement from implying that Crucible executes every transition in every Operational Lifecycle.
Transition conditions can include:
Executing only allocated transitions after satisfaction of their transition conditions supports:
Satisfaction of the transition conditions permits execution of the transition. Satisfaction of the transition conditions does not establish successful completion.
A failed or incomplete transition does not establish entry into the intended target state. MO-006c addresses recording of the current lifecycle state after transition execution.
This requirement does not associate the Operational Lifecycle revision with the Infrastructure Environment. MO-006a addresses that association.
This requirement does not initiate the Infrastructure Environment lifecycle. MO-006b addresses lifecycle initiation.
This requirement does not retire the Infrastructure Environment. MO-006e addresses Retirement.
This requirement applies to:
Verification confirms that:
The following pages reference this requirement:
Implemented and Verified.
Assess whether the current Crucible implementation executes each Operational Lifecycle transition allocated to Crucible when its transition conditions are satisfied.
Review and accept MO-006d as a proposed derived requirement created from the evaluation and decomposition of MO-006 in the Crucible System Requirements Specification, Version 1.1 Draft.
The following unresolved issues affect this requirement:
Define the Operational Lifecycle transitions allocated to Crucible.
Define the source state, target state, and transition conditions for each transition allocated to Crucible.
Define the completion and failure criteria for each transition allocated to Crucible.
Define the behavior required when one or more transition conditions are not satisfied.
Define the behavior required when transition execution fails, is interrupted, or remains incomplete.
Define the recovery or rollback behavior associated with each transition allocated to Crucible.
This requirement page should retain the stable requirement identifier MO-006d.
This page is a leaf requirement page and omits a trailing :start from its namespace.
The parent MO-006 page is a non-leaf page and retains a trailing :start in its namespace.
Changes to the Statement should preserve:
The transition definition should identify:
Material changes should receive review and should update the verification criteria, source records, and Issues section.
To reference this requirement Statement from another wiki page, insert:
{{section>dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-006:mo-006d#Statement&noheader&nofooter&noeditbtn}}
Do not rename this page after an external citation unless a redirect or move plan is in place.
© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.