Crucible SHALL associate each Infrastructure Environment with an identified revision of an Operational Lifecycle.
This requirement derives from:
The Original Requirement states:
The system SHALL support infrastructure lifecycle management from initial deployment through retirement.[C1]
MO-006a preserves the lifecycle-management intent of the Original Requirement by requiring each Infrastructure Environment to have an identified Operational Lifecycle revision.
The separate requirements derived from MO-006 address:
An identified revision of an Operational Lifecycle defines the lifecycle framework governing an Infrastructure Environment.
The Operational Lifecycle revision provides the basis for determining:
Different Infrastructure Environments may require different Operational Lifecycle revisions because of differences in:
Identifying the Operational Lifecycle revision supports:
This requirement establishes the association between an Infrastructure Environment and an Operational Lifecycle revision.
This requirement does not initiate the associated Operational Lifecycle. MO-006b addresses lifecycle initiation.
This requirement does not record the current lifecycle state. MO-006c addresses lifecycle-state recording.
This requirement does not execute lifecycle transitions. MO-006d addresses transition execution.
This requirement does not retire the Infrastructure Environment. MO-006e addresses Retirement.
This requirement applies to:
Verification confirms that:
The following pages reference this requirement:
Implemented and Verified.
Assess whether the current Crucible implementation associates each Infrastructure Environment with an identified Operational Lifecycle revision.
Review and accept MO-006a as a proposed derived requirement created from the evaluation and decomposition of MO-006 in the Crucible System Requirements Specification, Version 1.1 Draft.
The following unresolved issues affect this requirement:
Identify the Operational Lifecycles that may govern an Infrastructure Environment.
Define the identifier and revision scheme used for Operational Lifecycles.
Identify the authority or process responsible for associating an Operational Lifecycle revision with an Infrastructure Environment.
Define when the Operational Lifecycle association becomes effective.
Define the behavior required when more than one Operational Lifecycle revision appears to govern the same Infrastructure Environment.
Define the behavior required when an associated Operational Lifecycle revision is superseded or withdrawn.
This requirement page should retain the stable requirement identifier MO-006a.
This page is a leaf requirement page and omits a trailing :start from its namespace.
The parent MO-006 page is a non-leaf page and retains a trailing :start in its namespace.
Changes to the Statement should preserve:
The lifecycle-association record should identify:
Material changes should receive review and should update the verification criteria, source records, and Issues section.
To reference this requirement Statement from another wiki page, insert:
{{section>dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-006:mo-006a#Statement&noheader&nofooter&noeditbtn}}
Do not rename this page after an external citation unless a redirect or move plan is in place.
© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.