Crucible SHALL apply the same approved Infrastructure Baseline revision to two or more Infrastructure Deployments.
This requirement derives from:
The Original Requirement states:
The system SHALL establish infrastructure as a reusable and version-controlled asset.[C1]
MO-005e preserves the reuse intent of the Original Requirement by requiring Crucible to apply the same approved Infrastructure Baseline revision to multiple Infrastructure Deployments.
The separate requirements derived from MO-005 address:
Reuse occurs when Crucible applies the same approved Infrastructure Baseline revision to more than one Infrastructure Deployment.
The minimum threshold of two Infrastructure Deployments distinguishes demonstrated reuse from a single application of an Infrastructure Baseline revision.
Reuse supports:
The Infrastructure Deployments may differ in deployment instance, location, operational environment, Deployment Platform, execution time, or intended use, provided that Crucible applies the same approved Infrastructure Baseline revision.
The resulting Infrastructure Environments need not be identical when permitted deployment-specific parameters or Provider Implementations produce controlled differences.
This requirement does not permit modification of the approved Infrastructure Baseline revision during reuse. MO-005f addresses preservation of approved revisions.
This requirement does not define the deployment record that identifies the applied Infrastructure Baseline revision. MO-005g addresses that Traceability.
This requirement applies to:
Verification confirms that:
The following pages reference this requirement:
Implemented and Verified.
Assess whether the current Crucible implementation applies the same approved Infrastructure Baseline revision to two or more Infrastructure Deployments.
Review and accept MO-005e as a proposed derived requirement created from the evaluation and decomposition of MO-005 in the Crucible System Requirements Specification, Version 1.1 Draft.
The following unresolved issues affect this requirement:
Confirm that two Infrastructure Deployments provide the minimum sufficient demonstration of Infrastructure Baseline reuse.
Define the criteria used to determine that two Infrastructure Deployments apply the same Infrastructure Baseline revision.
Define the deployment-specific parameters that may differ without changing the reused Infrastructure Baseline revision.
Define the permitted differences among Infrastructure Environments produced from the same approved Infrastructure Baseline revision.
Define whether reuse across different Deployment Platforms or operational environments requires additional equivalence criteria.
This requirement page should retain the stable requirement identifier MO-005e.
This page is a leaf requirement page and omits a trailing :start from its namespace.
The parent MO-005 page is a non-leaf page and retains a trailing :start in its namespace.
Changes to the Statement should preserve:
The reuse record should identify:
Material changes should receive review and should update the verification criteria, source records, and Issues section.
To reference this requirement Statement from another wiki page, insert:
{{section>dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-005:mo-005e#Statement&noheader&nofooter&noeditbtn}}
Do not rename this page after an external citation unless a redirect or move plan is in place.
© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.