Crucible SHALL execute each selected Operational Lifecycle activity in a Connected Environment.
This requirement derives from:
The Original Requirement states:
The system SHALL support both connected and disconnected operational environments.[C1]
MO-004a preserves the portion of the Original Requirement that requires Crucible to operate within a Connected Environment.
The separate requirements derived from MO-004 address:
A Connected Environment provides network connectivity to resources required by selected Operational Lifecycle activities.
Operational Lifecycle activities can include:
The selected activities define the required scope of execution. Selection prevents this requirement from implying that every Operational Lifecycle activity applies to every Connected Environment or operational context.
Execution in a Connected Environment supports access to network services, repositories, registries, data sources, and other resources available within the environment.
This requirement does not establish the requirements for execution in a Disconnected Environment. MO-004b addresses that outcome.
This requirement does not establish which resources Crucible is authorized to use. MO-004c addresses Authorized Resource use.
This requirement applies to:
Verification confirms that:
The following pages reference this requirement:
Implemented and Verified
Assess whether the current Crucible implementation executes each selected Operational Lifecycle activity in a Connected Environment.
Review and accept MO-004a as a proposed derived requirement created from the evaluation and decomposition of MO-004 in the Crucible System Requirements Specification, Version 1.1 Draft.
The following unresolved issues affect this requirement:
Identify the Operational Lifecycle activities that Crucible must execute within a Connected Environment.
Identify the controlling source that selects the Operational Lifecycle activities for a Connected Environment.
Define the starting condition, completion condition, required inputs, required outputs, and failure criteria for each selected Operational Lifecycle activity.
Identify the resources available within each Connected Environment and distinguish available resources from Authorized Resources.
This requirement page should retain the stable requirement identifier MO-004a.
This page is a leaf requirement page and omits a trailing :start from its namespace.
The parent MO-004 page is a non-leaf page and retains a trailing :start in its namespace.
Changes to the Statement should preserve:
The unresolved activity-selection source should remain recorded in the Issues section until a controlling source identifies the activities required within a Connected Environment.
Material changes should receive review and should update the verification criteria, source records, and Issues section.
To reference this requirement Statement from another wiki page, insert:
{{section>dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-004:mo-004a#Statement&noheader&nofooter&noeditbtn}}
Do not rename this page after an external citation unless a redirect or move plan is in place.
© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.