Crucible SHALL reduce platform deployment timelines from months to days or hours through automation.[C2]
The Original Requirement preserves the approved mission objective but does not express independently testable normative statements.
The following Specification Discipline and Authoring findings apply:
The Original Requirement combines:
The maximum permitted duration and the reduction relative to a baseline can be evaluated independently.
The Original Requirement does not identify:
The Original Requirement therefore requires:
The decomposition preserves MO-002 as the stable parent requirement identifier. Each proposed replacement requirement receives a lettered identifier and a separate leaf requirement page.
The Original Requirement is decomposed into the following proposed replacement requirements:
Review and approve the proposed decomposition of MO-002 into an absolute Platform Deployment Duration requirement and a relative Platform Deployment timeline-reduction requirement.
Determine whether automation is a required implementation constraint, an architectural decision, or explanatory source language that should not appear in the derived requirements.
Determine whether MO-002a and MO-002b collectively supersede MO-002.
If MO-002a and MO-002b are accepted as the complete replacement for MO-002, mark MO-002 as superseded and preserve this page as the parent Traceability record.
The following unresolved issues affect the decomposition of MO-002:
Identify the Platform Deployment activity measured by MO-002.
Define the start condition and completion condition used to calculate Platform Deployment Duration.
Define the maximum permitted Platform Deployment Duration represented by days or hours.
Identify the approved deployment-duration baseline represented by months.
Define the required reduction relative to the approved deployment-duration baseline.
Define how failed, interrupted, incomplete, or repeated Platform Deployments affect duration measurement.
Determine whether MO-002a and MO-002b provide complete coverage of the approved intent of MO-002.
This page should retain the stable parent requirement identifier MO-002.
This page is a non-leaf requirement page and retains a trailing :start in its namespace.
The child requirements are leaf requirement pages and omit a trailing :start from their namespaces.
The explicit child-page links should remain while the proposed decomposition is being developed. After the child pages have been created and finalized, the explicit links may be removed because the indexmenu displays the child requirement pages contained within the MO-002 namespace.
This page preserves:
The derived requirements should separate:
The phrase through automation should not be converted into a normative implementation constraint unless the requirement owner confirms that automation forms part of the approved requirement intent.
The Original Requirement should not be marked as superseded until the requirement owner:
After supersession, this page should remain as the parent Traceability record and should continue to preserve the Original Requirement and its assessment.
Material changes to the decomposition should update the child requirements, Requirement Status, Issues, and Traceability records.