MO-002a — Maximum Platform Deployment Duration

Go to MO-002 — Reduced Platform Deployment Timelines

Statement

Crucible SHALL complete the selected Platform Deployment within the maximum Deployment Duration established by the Acceptance Criteria.

Derived From

This requirement derives from:

The Original Requirement states:

Crucible SHALL reduce platform deployment timelines from months to days or hours through automation.[C2]

MO-002a preserves the portion of the Original Requirement that establishes a maximum duration for completing a Platform Deployment.

The separate requirement derived from MO-002 addresses:

Rationale

Organizations require predictable Platform Deployment timelines to support development, integration, testing, evaluation, release, recovery, and operational planning.

The phrase days or hours does not establish an objectively verifiable performance obligation. A maximum Deployment Duration provides a measurable limit based on defined measurement boundaries.

The Acceptance Criteria establish:

Separating the maximum duration requirement from the relative duration-reduction requirement permits Crucible to satisfy one requirement while independently passing or failing the other.

This requirement does not require the measured Deployment Duration to improve upon an approved Deployment Baseline. MO-002b addresses that outcome.

Applies To

This requirement applies to:

Verification

Verification confirms that:

  1. The selected Platform Deployment is identified
  2. The Acceptance Criteria identify the Platform Deployment activities included in the measurement
  3. The Acceptance Criteria identify the starting event
  4. The Acceptance Criteria identify the completion event
  5. The Acceptance Criteria establish the maximum permitted Deployment Duration
  6. Measurement begins when the defined starting event occurs
  7. Measurement ends when the defined completion event occurs
  8. The selected Platform Deployment reaches the state required by the completion event
  9. The measured Deployment Duration does not exceed the maximum Deployment Duration established by the Acceptance Criteria
  10. Failed, incomplete, interrupted, and repeated Platform Deployments receive the treatment established by the Acceptance Criteria
  11. The verification record preserves Traceability among the Acceptance Criteria, the selected Platform Deployment, the measured Deployment Duration, and the verification result

Referenced By

The following pages reference this requirement:

Delivery Phase

Implemented and Verified

Implementation Status

Measure the current Crucible implementation against the maximum Platform Deployment Duration established by the Acceptance Criteria.

Requirement Status

Review and accept MO-002a as a proposed derived requirement created from the evaluation and decomposition of MO-002 in the Crucible System Requirements Specification, Version 1.1 Draft.


Issues

The following unresolved issues affect this requirement:

Identify the Platform Deployment activities included in the Deployment Duration measurement.

Define the starting event and completion event used to calculate Platform Deployment Duration.

Define the maximum permitted Platform Deployment Duration and identify the controlling Acceptance Criteria.

Define the measurement conditions, precision, exclusions, and tolerances used to evaluate Platform Deployment Duration.

Define how failed, incomplete, interrupted, and repeated Platform Deployments affect the measured Deployment Duration.


Notes for Editors

This requirement page should retain the stable requirement identifier MO-002a.

This page is a leaf requirement page and omits a trailing :start from its namespace.

The parent MO-002 page is a non-leaf page and retains a trailing :start in its namespace.

Changes to the Statement should preserve:

The Acceptance Criteria should identify:

Material changes should receive review and should update the verification criteria, source records, and Issues section.

To reference this requirement Statement from another wiki page, insert:

{{section>dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-002:mo-002a#Statement&noheader&nofooter&noeditbtn}}

Do not rename this page after an external citation unless a redirect or move plan is in place.


© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.