Crucible SHALL create an Infrastructure Environment within the Deployment Duration established by the Acceptance Criteria.
This requirement derives from:
The Original Requirement states:
Crucible SHALL enable rapid creation of repeatable, compliant, and secure infrastructure environments.[C1]
MO-001b preserves the portion of the Original Requirement that characterizes Infrastructure Environment creation as rapid by requiring Crucible to satisfy a defined Deployment Duration.
The separate requirements derived from MO-001 address:
Organizations require predictable Infrastructure Environment creation times to support development, testing, evaluation, deployment, recovery, and operational planning.
The word rapid does not establish an objective performance obligation. A defined Deployment Duration provides a measurable constraint based on an identified start condition, completion condition, and duration threshold.
The Acceptance Criteria establish the Deployment Duration against which Crucible is evaluated.
Separating deployment duration from Infrastructure Environment creation permits Crucible to satisfy the creation requirement while independently passing or failing the duration requirement.
This requirement does not define the content of the Infrastructure Environment, the equivalence criteria used for reproducibility, the Security Baseline, or the Compliance Baseline. The other requirements derived from MO-001 address those outcomes.
This requirement applies to:
Verification confirms that:
The following pages reference this requirement:
Implemented and Verified
Measure the current Crucible implementation against the Deployment Duration established by the Acceptance Criteria.
Review and accept MO-001b as a proposed derived requirement created from the evaluation and decomposition of MO-001 in the Crucible System Requirements Specification, Version 1.1 Draft.
The following unresolved issues affect this requirement:
Define the Infrastructure Environment creation activity measured by the Deployment Duration.
Define the start condition and completion condition used to calculate the Deployment Duration.
Define the permitted Deployment Duration and identify the controlling Acceptance Criteria.
Identify any operational conditions, exclusions, or measurement tolerances that affect the Deployment Duration.
This requirement page should retain the stable requirement identifier MO-001b.
This page is a leaf requirement page and omits a trailing :start from its namespace.
The parent MO-001 page is a non-leaf page and retains a trailing :start in its namespace.
Changes to the Statement should preserve:
The Acceptance Criteria should identify:
Material changes should receive review and should update the verification criteria, source records, and Issues section.
To reference this requirement Statement from another wiki page, insert:
{{section>dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-001:mo-001b#Statement&noheader&nofooter&noeditbtn}}
Do not rename this page after an external citation unless a redirect or move plan is in place.
© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.