Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
| public:99_annexes:annex-b-terms-and-definitions:m:maintainability_criterion [2026/09/12 17:42] – removed - external edit (Unknown date) 127.0.0.1 | public:99_annexes:annex-b-terms-and-definitions:m:maintainability_criterion [2026/09/12 17:43] (current) – ↷ Links adapted because of a move operation nick_dido | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| + | ====== Maintainability Criterion ====== | ||
| + | |||
| + | [[public: | ||
| + | |||
| + | ===== Discussion ===== | ||
| + | |||
| + | A Maintainability Criterion establishes a measurable condition used to evaluate the [[public: | ||
| + | |||
| + | A Maintainability Criterion may specify: | ||
| + | |||
| + | * A threshold | ||
| + | * A tolerance | ||
| + | * An acceptable range | ||
| + | * A required property | ||
| + | * A permitted maintenance duration | ||
| + | * A maximum change effort | ||
| + | * A dependency-visibility condition | ||
| + | * A change-isolation condition | ||
| + | * A verification or regression-testing condition | ||
| + | |||
| + | The applicable Maintainability Criteria may originate from a [[public: | ||
| + | |||
| + | ===== Definition ===== | ||
| + | |||
| + | // | ||
| + | |||
| + | ===== Source ===== | ||
| + | |||
| + | Dido Solutions, Inc. and Jackrabbit Consulting, Inc., derived from the maintainability concepts in ISO/IEC 25010:2023 | ||
| + | |||
| + | ===== Note ===== | ||
| + | |||
| + | A Maintainability Criterion states the condition used for evaluation. It does not state the measured or observed result of that evaluation. | ||
| + | |||
| + | A criterion may address modularity, reusability, | ||
| + | |||
| + | When applicable Maintainability Criteria conflict, DIDO-TE records and surfaces the conflict without inventing precedence. The appropriate Community of Interest or designated Authority resolves the conflict. | ||
| + | |||
| + | ===== Example ===== | ||
| + | |||
| + | A requirement that an authorized configuration change be implemented and regression tested within four hours establishes a Maintainability Criterion containing a maximum maintenance duration and a verification condition. | ||
| + | |||
| + | ---- | ||
| + | |||
| + | <WRAP centeralign> | ||
| + | © 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc. | ||
| + | </ | ||