| Both sides previous revision Previous revision Next revision | Previous revision |
| public:00-sip-ra:06-specific-requirements-on-proposals:06-4-required-submission-content:start [2026/09/14 18:08] – nick_dido | public:00-sip-ra:06-specific-requirements-on-proposals:06-4-required-submission-content:start [2026/09/14 18:17] (current) – nick_dido |
|---|
| [[public:00-sip-ra:06-specific-requirements-on-proposals:start|Return to Specific Requirements on Proposals]] | [[public:00-sip-ra:06-specific-requirements-on-proposals:start|Return to Specific Requirements on Proposals]] |
| |
| A Submission provides the specification material needed to evaluate the proposed [[public:99_annexes:annex-b-terms-and-definitions:r:reference_architecture|Reference Architecture]] against the scope and relationship requirements of this RFP. | A Submission provides the specification material needed to evaluate the proposed [[public:99_annexes:annex-b-terms-and-definitions:r:reference_architecture|Reference Architecture]] against the requirements of this RFP. |
| |
| ===== Requirement ===== | ===== Requirements ===== |
| |
| * **[[public:00-sip-ra:99-annexes:annex-c-requirements:sip-042-complete-reference-architecture-specification|SIP-042 — Complete Reference Architecture Specification]]:** The Submission SHALL include a complete specification of the proposed Reference Architecture that addresses all applicable requirements defined in [[public:00-sip-ra:06-specific-requirements-on-proposals:06-2-scope-of-proposals-sought:start|Section 6.2 Scope of Proposals Sought]] and [[public:00-sip-ra:06-specific-requirements-on-proposals:06-3-relationship-to-other-omg-specifications:start|Section 6.3 Relationship to Other OMG Specifications]] | ^ Requirement ^ Statement ^ |
| | | [[public:00-sip-ra:99-annexes:annex-c-requirements:sip-042-complete-reference-architecture-specification|SIP-042 — Complete Reference Architecture Specification]] | {{section>public:00-sip-ra:99-annexes:annex-c-requirements:sip-042-complete-reference-architecture-specification#Statement&noheader&nofooter&noeditbtn}} | |
| The specification may be provided as a single integrated document or as a coordinated set of submission artifacts. | | [[public:00-sip-ra:99-annexes:annex-c-requirements:sip-043-integrated-submission-document|SIP-043 — Integrated Submission Document]] | {{section>public:00-sip-ra:99-annexes:annex-c-requirements:sip-043-integrated-submission-document#Statement&noheader&nofooter&noeditbtn}} | |
| |
| This page identifies the subsections for Required Submission Content. | This page identifies the subsections for Required Submission Content. |
| ===== Notes for Editors ===== | ===== Notes for Editors ===== |
| |
| After SIP-042 is created and reviewed in Annex C, replace the locally maintained Statement with a transclusion of its authoritative Statement. | The requirement identifiers and short titles link to the authoritative requirement records in Annex C. |
| | |
| | The Statements displayed in this section are transcluded from the corresponding Annex C requirement pages and are not independently maintained copies. |
| | |
| | Make changes to a Statement on its Annex C requirement page. |
| | |
| | SIP-042 establishes the required completeness of the submitted specification. SIP-043 permits the specification to be organized as one integrated document but does not require that document organization. |
| |
| If no subordinate pages are created under Section 6.4, remove the sentence introducing the subsections and the Indexmenu statement. | If Section 6.4 has no subordinate pages, remove the sentence introducing the subsections and the Indexmenu statement. |
| |
| ---- | ---- |