public:00-sip-ra:06-specific-requirements-on-proposals:06-4-required-submission-content:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
public:00-sip-ra:06-specific-requirements-on-proposals:06-4-required-submission-content:start [2026/09/13 18:40] – nick_didopublic:00-sip-ra:06-specific-requirements-on-proposals:06-4-required-submission-content:start [2026/09/14 18:17] (current) – nick_dido
Line 3: Line 3:
 [[public:00-sip-ra:06-specific-requirements-on-proposals:start|Return to Specific Requirements on Proposals]] [[public:00-sip-ra:06-specific-requirements-on-proposals:start|Return to Specific Requirements on Proposals]]
  
-  - A proposal SHALL consist of a complete [[public:99_annexes:annex-b-terms-and-definitions:r:reference_architecture|Reference Architecture]] specification addressing the requirements defined in [[public:00-sip-ra:06-specific-requirements-on-proposals:06-2-scope-of-proposals-sought:start|Section 6.2 Scope of Proposals Sought]] and [[public:00-sip-ra:06-specific-requirements-on-proposals:06-3-relationship-to-other-omg-specifications:start|Section 6.3 Relationship to Other OMG Specifications]]. +A Submission provides the specification material needed to evaluate the proposed [[public:99_annexes:annex-b-terms-and-definitions:r:reference_architecture|Reference Architecture]] against the requirements of this RFP. 
-  - The specification MAY be submitted as a single integrated document.+ 
 +===== Requirements ===== 
 + 
 +^ Requirement ^ Statement ^ 
 +| [[public:00-sip-ra:99-annexes:annex-c-requirements:sip-042-complete-reference-architecture-specification|SIP-042 — Complete Reference Architecture Specification]] | {{section>public:00-sip-ra:99-annexes:annex-c-requirements:sip-042-complete-reference-architecture-specification#Statement&noheader&nofooter&noeditbtn}} | 
 +| [[public:00-sip-ra:99-annexes:annex-c-requirements:sip-043-integrated-submission-document|SIP-043 — Integrated Submission Document]] | {{section>public:00-sip-ra:99-annexes:annex-c-requirements:sip-043-integrated-submission-document#Statement&noheader&nofooter&noeditbtn}} |
  
 This page identifies the subsections for Required Submission Content. This page identifies the subsections for Required Submission Content.
Line 10: Line 15:
 {{indexmenu>public:00-sip-ra:06-specific-requirements-on-proposals:06-4-required-submission-content#1|js navbar nocookie maxjs#1 id#sip_ra_required_submission_content_nav}} {{indexmenu>public:00-sip-ra:06-specific-requirements-on-proposals:06-4-required-submission-content#1|js navbar nocookie maxjs#1 id#sip_ra_required_submission_content_nav}}
  
----+===== Notes for Editors ===== 
 + 
 +The requirement identifiers and short titles link to the authoritative requirement records in Annex C. 
 + 
 +The Statements displayed in this section are transcluded from the corresponding Annex C requirement pages and are not independently maintained copies. 
 + 
 +Make changes to a Statement on its Annex C requirement page. 
 + 
 +SIP-042 establishes the required completeness of the submitted specification. SIP-043 permits the specification to be organized as one integrated document but does not require that document organization. 
 + 
 +If Section 6.4 has no subordinate pages, remove the sentence introducing the subsections and the Indexmenu statement. 
 + 
 +----
  
 <WRAP centeralign> <WRAP centeralign>
 © 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc. © 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.
 </WRAP> </WRAP>
- 
  • public/00-sip-ra/06-specific-requirements-on-proposals/06-4-required-submission-content/start.1789350041.txt.gz
  • Last modified: 2026/09/13 18:40
  • by nick_dido