public:00-sip-ra:06-specific-requirements-on-proposals:06-4-required-submission-content:06-4-7-rfp-traceability:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
public:00-sip-ra:06-specific-requirements-on-proposals:06-4-required-submission-content:06-4-7-rfp-traceability:start [2026/09/12 18:34] – ↷ Links adapted because of a move operation nick_didopublic:00-sip-ra:06-specific-requirements-on-proposals:06-4-required-submission-content:06-4-7-rfp-traceability:start [2026/09/14 18:55] (current) – [Requirements] nick_dido
Line 3: Line 3:
 [[public:00-sip-ra:06-specific-requirements-on-proposals:06-4-required-submission-content:start|Return to Required Submission Content]] [[public:00-sip-ra:06-specific-requirements-on-proposals:06-4-required-submission-content:start|Return to Required Submission Content]]
  
-Traceability establishes an explicit correspondence between the mandatory requirements of this RFP and the submitted specification.+[[public:99_annexes:annex-b-terms-and-definitions:t:traceability|Traceability]] establishes an explicit correspondence between the requirements of this RFP and the locations within the Submission where those requirements are addressed.
  
-  - Proposals SHALL include a traceability map. +===== Requirements =====
-  - Proposals SHALL link each mandatory requirement defined in [[public:00-sip-ra:05-general-requirements-on-proposals:start|Section 5 General Requirements on Proposals]] to one or more specific locations within the submitted specification. +
-  - Proposals SHALL link each mandatory requirement defined in [[public:00-sip-ra:06-specific-requirements-on-proposals:start|Section 6 Specific Requirements on Proposals]] to one or more specific locations within the submitted specification. +
-  - Proposals SHALL identify how each mandatory requirement is satisfied within the submitted architecture. +
-  - Proposals SHALL identify any mandatory requirement that is not fully satisfied and provide justification.+
  
 +^ Requirement ^ Statement ^
 +| [[public:00-sip-ra:99-annexes:annex-c-requirements:sip-056-rfp-traceability-map|SIP-056 — RFP Traceability Map]] | {{section>public:00-sip-ra:99-annexes:annex-c-requirements:sip-056-rfp-traceability-map#Statement&noheader&nofooter&noeditbtn}} |
 +| [[public:00-sip-ra:99-annexes:annex-c-requirements:sip-057-requirement-to-specification-traceability|SIP-057 — Requirement-to-Specification Traceability]] | {{section>public:00-sip-ra:99-annexes:annex-c-requirements:sip-057-requirement-to-specification-traceability#Statement&noheader&nofooter&noeditbtn}} |
 +| [[public:00-sip-ra:99-annexes:annex-c-requirements:sip-058-incomplete-requirement-disclosure|SIP-058 — Incomplete Requirement Disclosure]] | {{section>public:00-sip-ra:99-annexes:annex-c-requirements:sip-058-incomplete-requirement-disclosure#Statement&noheader&nofooter&noeditbtn}} |
 ===== Note ===== ===== Note =====
  
-> A consolidated corpus of mandatory requirements is provided in Appendix C for convenience. The normative source of all requirements remains Sections 5 and 6.+> Annex C provides the authoritative requirement records for this RFP. Sections 5 and 6 organize those requirements within their applicable context and display their authoritative Statements by transclusion from Annex C.
  
----+> Identifying an incompletely satisfied mandatory requirement does not make the Submission conformant with that requirement or waive the requirement. Any determination concerning acceptability remains subject to the applicable OMG process. 
 + 
 +===== Notes for Editors ===== 
 + 
 +The links to SIP-056 through SIP-058 provide temporary access to their individual Annex C requirement pages while those records are being created and reviewed. 
 + 
 +After those records are complete, replace each locally maintained Statement with a transclusion of its authoritative Statement. 
 + 
 +Every normative requirement in Sections 5 and 6 should have a corresponding authoritative record in Annex C. Section pages should transclude the Statement from that record rather than maintain a separate copy. 
 + 
 +SIP-056 requires the traceability-map deliverable. SIP-057 defines its required mappings and satisfaction information. SIP-058 requires transparent identification of requirements that are not fully satisfied. 
 + 
 +----
  
 <WRAP centeralign> <WRAP centeralign>
 © 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc. © 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.
 </WRAP> </WRAP>
- 
  • public/00-sip-ra/06-specific-requirements-on-proposals/06-4-required-submission-content/06-4-7-rfp-traceability/start.1789263250.txt.gz
  • Last modified: 2026/09/12 18:34
  • by nick_dido