public:00-sip-ra:06-specific-requirements-on-proposals:06-4-required-submission-content:06-4-1-architectural-description:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
public:00-sip-ra:06-specific-requirements-on-proposals:06-4-required-submission-content:06-4-1-architectural-description:start [2026/09/12 18:34] – ↷ Links adapted because of a move operation nick_didopublic:00-sip-ra:06-specific-requirements-on-proposals:06-4-required-submission-content:06-4-1-architectural-description:start [2026/09/14 18:28] (current) – nick_dido
Line 3: Line 3:
 [[public:00-sip-ra:06-specific-requirements-on-proposals:06-4-required-submission-content:start|Return to Required Submission Content]] [[public:00-sip-ra:06-specific-requirements-on-proposals:06-4-required-submission-content:start|Return to Required Submission Content]]
  
-The architectural description defines the structural organization of the [[public:99_annexes:annex-b-terms-and-definitions:r:reference_architecture|Reference Architecture]], including its elements, relationships, interaction constructs, and governance abstractions.+The architectural description defines the structural organization of the proposed [[public:99_annexes:annex-b-terms-and-definitions:r:reference_architecture|Reference Architecture]], including its elements, responsibilities, relationships, interaction constructs, attachment points, processing flows, boundary constructs, and [[public:99_annexes:annex-b-terms-and-definitions:g:governance|Governance]] abstractions.
  
-  - Proposals SHALL include a structured architectural description of the Reference Architecture. +===== Requirements ===== 
-  - Proposals SHALL describe the architectural elements, their responsibilities, and the relationships among them. + 
-  - Proposals SHALL describe the interaction constructs and attachment points through which structured information flows between architectural elements. +^ Requirement ^ Statement ^ 
-  - Proposals SHALL provide visual representations illustrating ordered processing flows and boundary constructs without requiring any specific modeling notation. +| [[public:00-sip-ra:99-annexes:annex-c-requirements:sip-044-structured-architectural-description|SIP-044 — Structured Architectural Description]] | {{section>public:00-sip-ra:99-annexes:annex-c-requirements:sip-044-structured-architectural-description#Statement&noheader&nofooter&noeditbtn}} | 
-  - Proposals SHALL describe the architectural separation between the data plane and the control plane. +| [[public:00-sip-ra:99-annexes:annex-c-requirements:sip-045-architectural-visual-representations|SIP-045 — Architectural Visual Representations]] | {{section>public:00-sip-ra:99-annexes:annex-c-requirements:sip-045-architectural-visual-representations#Statement&noheader&nofooter&noeditbtn}} | 
-  - Proposals SHALL describe how governance constraints are defined independently of interface contracts.+ 
 +===== Required Coverage ===== 
 + 
 +The architectural description required by SIP-044 includes the architectural information governed by the following requirements: 
 + 
 +^ Requirement ^ Required Architectural Information ^ 
 +| [[public:00-sip-ra:99-annexes:annex-c-requirements:sip-003-reference-architecture-constituents|SIP-003 — Reference Architecture Constituents]] | Architectural elements, roles, responsibilities, relationships, and interaction constructs | 
 +| [[public:00-sip-ra:99-annexes:annex-c-requirements:sip-005-structured-information-flow|SIP-005 — Structured Information Flow]] | Architectural constructs representing the flow of structured information | 
 +| [[public:00-sip-ra:99-annexes:annex-c-requirements:sip-006-ordered-modular-processing-flows|SIP-006 — Ordered Modular Processing Flows]] | Ordered processing flows composed of modular components | 
 +| [[public:00-sip-ra:99-annexes:annex-c-requirements:sip-007-structured-information-attachment-points|SIP-007 — Structured Information Attachment Points]] | Attachment points through which structured information enters and exits architectural elements | 
 +| [[public:00-sip-ra:99-annexes:annex-c-requirements:sip-008-information-boundary-constructs|SIP-008 — Information Boundary Constructs]] | Boundary constructs governing ingress, transformation, and egress | 
 +| [[public:00-sip-ra:99-annexes:annex-c-requirements:sip-019-data-plane-and-control-plane-separation|SIP-019 — Data Plane and Control Plane Separation]] | Architectural separation between the data plane and the control plane | 
 +| [[public:00-sip-ra:99-annexes:annex-c-requirements:sip-020-governance-constraints-and-interface-contracts|SIP-020 — Governance Constraints and Interface Contracts]] | Separation of Governance constraints from Interface Contracts | 
 + 
 +===== Notes for Editors ===== 
 + 
 +The requirement identifiers and short titles link to the authoritative requirement records in Annex C. 
 + 
 +The Statements for SIP-044 and SIP-045 are transcluded from their corresponding Annex C requirement pages and are not independently maintained copies. 
 + 
 +Make changes to a Statement on its Annex C requirement page. 
 + 
 +The Required Coverage table provides a nonnormative summary of the architectural information governed by the referenced requirements. The corresponding Annex C records remain authoritative. 
 + 
 +SIP-042 requires the Submission to include a complete specification addressing all applicable requirements. SIP-044 establishes that the specification includes a structured architectural description. Together, they require the architectural description to document the applicable information governed by SIP-003, SIP-005 through SIP-008, SIP-019, and SIP-020. 
 + 
 +SIP-045 requires visual representations as specification deliverables. It does not make the notation used to create those representations mandatory for conforming implementations.
  
 ---- ----
Line 17: Line 43:
 © 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc. © 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.
 </WRAP> </WRAP>
- 
  • public/00-sip-ra/06-specific-requirements-on-proposals/06-4-required-submission-content/06-4-1-architectural-description/start.1789263251.txt.gz
  • Last modified: 2026/09/12 18:34
  • by nick_dido