Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
public:00-sip-ra:06-specific-requirements-on-proposals:06-2-scope-of-proposals-sought:start [2026/09/12 18:33] – removed - external edit (Unknown date) 127.0.0.1public:00-sip-ra:06-specific-requirements-on-proposals:06-2-scope-of-proposals-sought:start [2026/09/13 18:39] (current) – nick_dido
Line 1: Line 1:
 +====== 6.2 Scope of Proposals Sought ======
 +
 +[[public:00-sip-ra:06-specific-requirements-on-proposals:start|Return to Specific Requirements on Proposals]]
 +
 +The requested [[public:99_annexes:annex-b-terms-and-definitions:p:platform_independent_model|Platform Independent Model (PIM)]] is limited to architectural abstraction and governance constructs governing structured information processing.
 +
 +The requested PIM does not extend to domain-specific data content, transport protocols, deployment topologies, or implementation technologies.
 +
 +The requested [[public:99_annexes:annex-b-terms-and-definitions:r:reference_architecture|Reference Architecture]] operates at the structural and governance abstraction layer. It defines separation of concerns, lifecycle control, and conformance boundaries.
 +
 +The requested Reference Architecture complements existing OMG specifications addressing exchange, interoperability, and semantic federation. It does not duplicate or replace those specifications.
 +
 +This page identifies the subsections for Scope of Proposals Sought.
 +
 +{{indexmenu>public:00-sip-ra:06-specific-requirements-on-proposals:06-2-scope-of-proposals-sought#1|js navbar nocookie maxjs#1 id#sip_ra_scope_of_proposals_sought_nav}}
 +
 +----
 +
 +<WRAP centeralign>
 +© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.
 +</WRAP>