This is an old revision of the document!


5.2 Evaluation Criteria

Return to General Requirements on Proposals

Although OMG adopts model-based specifications rather than their implementations, OMG takes the technical viability of implementations into account during the evaluation process.

The following criteria are used:


© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.

  • public/00-sip-ra/05-general-requirements-on-proposals/05-2-evaluation-criteria/start.1789263205.txt.gz
  • Last modified: 2026/09/12 18:33
  • by nick_dido