public:00-sip-ra:05-general-requirements-on-proposals:05-1-requirements:05-1-5-changes-to-existing-specifications:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
public:00-sip-ra:05-general-requirements-on-proposals:05-1-requirements:05-1-5-changes-to-existing-specifications:start [2026/09/15 11:40] – nick_didopublic:00-sip-ra:05-general-requirements-on-proposals:05-1-requirements:05-1-5-changes-to-existing-specifications:start [2026/09/15 12:07] (current) – nick_dido
Line 3: Line 3:
 [[public:00-sip-ra:05-general-requirements-on-proposals:05-1-requirements:start|Return to Requirements]] [[public:00-sip-ra:05-general-requirements-on-proposals:05-1-requirements:start|Return to Requirements]]
  
-A Submission may identify changes or extensions to existing OMG specifications that would be required for adoption. Any such change or extension must be explicit, justified, and fully specified.+A Submission may identify changes or extensions to existing OMG specifications that would be required for its adoption. GPR-008 governs how to identify, justify, and specify those changes or extensions.
  
 ===== Requirement ===== ===== Requirement =====
  
-  * **[[public:00-sip-ra:99-annexes:annex-c-requirements:gpr-008-required-changes-and-extensions-to-existing-omg-specifications|GPR-008 — Required Changes and Extensions to Existing OMG Specifications]]:** A Submission that requires a change or extension to an existing OMG specification for its adoption SHALL identify, justify, and fully specify each required change or extension+^ Requirement ^ Level ^ Statement ^ 
 +| [[public:00-sip-ra:99-annexes:annex-c-requirements:gpr-008-required-changes-and-extensions-to-existing-omg-specifications|GPR-008 — Required Changes and Extensions to Existing OMG Specifications]] | Mandatory when applicable | {{section>public:00-sip-ra:99-annexes:annex-c-requirements:gpr-008-required-changes-and-extensions-to-existing-omg-specifications#Statement&noheader&nofooter&noeditbtn}} |
  
 OMG favors Submissions that are upwardly compatible with existing standards and that minimize changes and extensions to existing specifications. OMG favors Submissions that are upwardly compatible with existing standards and that minimize changes and extensions to existing specifications.
Line 13: Line 14:
 ===== Notes for Editors ===== ===== Notes for Editors =====
  
-GPR-008 is mandatory when its applicability condition is satisfied.+The requirement identifier and short title link to the authoritative requirement record in Annex C. 
 + 
 +The Statement displayed in this section is transcluded from its Annex C requirement page and is not an independently maintained copy. 
 + 
 +Make changes to the Statement or its Requirement Level on its Annex C requirement page. 
 + 
 +GPR-008 is mandatory when adoption of the Submission depends on changing or extending an existing OMG specification.
  
 The OMG preference for upward compatibility and minimal change is an evaluation consideration rather than a separate normative requirement because it does not use ''SHALL'' or ''SHOULD''. The OMG preference for upward compatibility and minimal change is an evaluation consideration rather than a separate normative requirement because it does not use ''SHALL'' or ''SHOULD''.
Line 23: Line 30:
   * [[public:00-sip-ra:99-annexes:annex-c-requirements:sip-034-preservation-of-existing-transport-and-exchange-constructs|SIP-034 — Preservation of Existing Transport and Exchange Constructs]]   * [[public:00-sip-ra:99-annexes:annex-c-requirements:sip-034-preservation-of-existing-transport-and-exchange-constructs|SIP-034 — Preservation of Existing Transport and Exchange Constructs]]
   * [[public:00-sip-ra:99-annexes:annex-c-requirements:sip-038-nonduplication-of-existing-capabilities|SIP-038 — Nonduplication of Existing Capabilities]]   * [[public:00-sip-ra:99-annexes:annex-c-requirements:sip-038-nonduplication-of-existing-capabilities|SIP-038 — Nonduplication of Existing Capabilities]]
- 
-After the Annex C record is created and reviewed, replace the locally maintained Statement with a transclusion of its authoritative Statement. 
  
 ---- ----
  • public/00-sip-ra/05-general-requirements-on-proposals/05-1-requirements/05-1-5-changes-to-existing-specifications/start.1789497619.txt.gz
  • Last modified: 2026/09/15 11:40
  • by nick_dido