public:00-sip-ra:05-general-requirements-on-proposals:05-1-requirements:05-1-2-pims-and-psms:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
public:00-sip-ra:05-general-requirements-on-proposals:05-1-requirements:05-1-2-pims-and-psms:start [2026/09/15 10:23] – nick_didopublic:00-sip-ra:05-general-requirements-on-proposals:05-1-requirements:05-1-2-pims-and-psms:start [2026/09/15 10:31] (current) – nick_dido
Line 9: Line 9:
 ===== Requirements ===== ===== Requirements =====
  
-  * **[[public:00-sip-ra:99-annexes:annex-c-requirements:gpr-003-pim-to-psm-mapping-definition|GPR-003 — PIM-to-PSM Mapping Definition]]:** A Submission that specifies a PIM and one or more corresponding PSMs SHALL reference an applicable standard mapping or specify the rules used to map the PIM to each PSM +^ Requirement ^ Level ^ Statement ^ 
- +| [[public:00-sip-ra:99-annexes:annex-c-requirements:gpr-003-pim-to-psm-mapping-definition|GPR-003 — PIM-to-PSM Mapping Definition]] | Mandatory when applicable | {{section>public:00-sip-ra:99-annexes:annex-c-requirements:gpr-003-pim-to-psm-mapping-definition#Statement&noheader&nofooter&noeditbtn}} | 
-  * **[[public:00-sip-ra:99-annexes:annex-c-requirements:gpr-004-pim-to-psm-normative-authority|GPR-004 — PIM-to-PSM Normative Authority]]:** A Submission that specifies a PIM and one or more corresponding PSMs SHALL identify whether the mapping rules or the resulting PSMs govern resolution of inconsistencies between them+| [[public:00-sip-ra:99-annexes:annex-c-requirements:gpr-004-pim-to-psm-normative-authority|GPR-004 — PIM-to-PSM Normative Authority]] | Mandatory when applicable | {{section>public:00-sip-ra:99-annexes:annex-c-requirements:gpr-004-pim-to-psm-normative-authority#Statement&noheader&nofooter&noeditbtn}} |
  
 ===== Notes for Editors ===== ===== Notes for Editors =====
  
-GPR-003 and GPR-004 are mandatory when their applicability condition is satisfied.+The requirement identifiers and short titles link to the authoritative requirement records in Annex C.
  
-GPR-003 requires either a reference to an applicable standard mapping or a specification of the mapping rules used by the Submission.+The Statements displayed in this section are transcluded from their corresponding Annex C requirement pages and are not independently maintained copies.
  
-GPR-004 requires the Submission to identify which representation has normative authority when the mapping rules and resulting PSMs are inconsistent. Stating that both are independently normative without defining precedence would not resolve an inconsistency.+Make changes to a Statement or its Requirement Level on its Annex C requirement page. 
 + 
 +GPR-003 and GPR-004 are mandatory when a Submission specifies a PIM and one or more corresponding PSMs. 
 + 
 +GPR-003 requires either a reference to an applicable standard mapping or a specification of the mapping rules used by the Submission.
  
-After the Annex C records are created and reviewed, replace each locally maintained Statement with a transclusion of its authoritative Statement.+GPR-004 requires the Submission to identify which representation has normative Authority when the mapping rules and resulting PSMs are inconsistent. Assigning independent normative Authority to both without defining precedence does not provide an unambiguous means of resolving an inconsistency.
  
 ---- ----
  • public/00-sip-ra/05-general-requirements-on-proposals/05-1-requirements/05-1-2-pims-and-psms/start.1789492995.txt.gz
  • Last modified: 2026/09/15 10:23
  • by nick_dido