Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
public:00-sip-ra:04-instructions-for-submitters:04-9-submission-format:04-9-2-mandatory-outline:start [2026/09/12 18:33] – ↷ Page moved from dido:00-sip-ra:04-instructions-for-submitters:04-9-submission-format:04-9-2-mandatory-outline:start to public:00-sip-ra:04-instructions-for-submitters:04-9-submission-format:04-9-2-mandatory-outline:start nick_didopublic:00-sip-ra:04-instructions-for-submitters:04-9-submission-format:04-9-2-mandatory-outline:start [2026/09/12 18:34] (current) – ↷ Links adapted because of a move operation nick_dido
Line 1: Line 1:
 ====== 4.9.2 Mandatory Outline ====== ====== 4.9.2 Mandatory Outline ======
  
-[[dido:00-sip-ra:04-instructions-for-submitters:04-9-submission-format:start|Return to Submission Format]]+[[public:00-sip-ra:04-instructions-for-submitters:04-9-submission-format:start|Return to Submission Format]]
  
 All submissions SHALL use the following structure, based on the OMG specification template [TEMPL]. All submissions SHALL use the following structure, based on the OMG specification template [TEMPL].
Line 15: Line 15:
   * The OMG document number of the main Submission document   * The OMG document number of the main Submission document
   * An overview or guide to the material in the Submission   * An overview or guide to the material in the Submission
-  * A statement of proof of concept, as described in [[dido:00-sip-ra:04-instructions-for-submitters:04-8-proof-of-concept:start|Section 4.8 Proof of Concept]] +  * A statement of proof of concept, as described in [[public:00-sip-ra:04-instructions-for-submitters:04-8-proof-of-concept:start|Section 4.8 Proof of Concept]] 
-  * A detailed rationale explaining why the proposal does not satisfy any general requirement stated in [[dido:00-sip-ra:05-general-requirements-on-proposals:start|Section 5 General Requirements on Proposals]] +  * A detailed rationale explaining why the proposal does not satisfy any general requirement stated in [[public:00-sip-ra:05-general-requirements-on-proposals:start|Section 5 General Requirements on Proposals]] 
-  * A discussion of each Issue to Be Discussed identified in [[dido:00-sip-ra:06-specific-requirements-on-proposals:start|Section 6 Specific Requirements on Proposals]] +  * A discussion of each Issue to Be Discussed identified in [[public:00-sip-ra:06-specific-requirements-on-proposals:start|Section 6 Specific Requirements on Proposals]] 
-  * An explanation of how the proposal satisfies the specific requirements and, where applicable, requests stated in [[dido:00-sip-ra:06-specific-requirements-on-proposals:start|Section 6 Specific Requirements on Proposals]]+  * An explanation of how the proposal satisfies the specific requirements and, where applicable, requests stated in [[public:00-sip-ra:06-specific-requirements-on-proposals:start|Section 6 Specific Requirements on Proposals]]
  
 If adopting the Submission requires changes to already-adopted OMG specifications, Section 0 SHALL include a list of those changes in a clearly labeled subsection. The list SHALL identify exactly which versions of which OMG specifications SHALL be amended. The list SHALL include the precise wording changes that SHALL be made to each affected specification. If adopting the Submission requires changes to already-adopted OMG specifications, Section 0 SHALL include a list of those changes in a clearly labeled subsection. The list SHALL identify exactly which versions of which OMG specifications SHALL be amended. The list SHALL include the precise wording changes that SHALL be made to each affected specification.
  • public/00-sip-ra/04-instructions-for-submitters/04-9-submission-format/04-9-2-mandatory-outline/start.1789263204.txt.gz
  • Last modified: 2026/09/12 18:33
  • by nick_dido