Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
public:00-sip-ra:04-instructions-for-submitters:04-8-proof-of-concept:start [2026/09/12 18:33] – removed - external edit (Unknown date) 127.0.0.1public:00-sip-ra:04-instructions-for-submitters:04-8-proof-of-concept:start [2026/09/12 18:34] (current) – ↷ Links adapted because of a move operation nick_dido
Line 1: Line 1:
 +====== 4.8 Proof of Concept ======
 +
 +[[public:00-sip-ra:04-instructions-for-submitters:start|Return to Instructions for Submitters]]
 +
 +Submissions SHALL include a proof of concept statement explaining how the submitted specifications have been demonstrated to be technically viable.
 +
 +Technical viability concerns the state of development and maturity of the technology on which a Submission is based. Technical viability differs from commercial availability.
 +
 +Proof-of-concept statements can contain any information the submitter deems relevant. Examples include:
 +
 +  * This specification has completed the design phase and is in the process of being prototyped
 +  * An implementation of this specification has been in beta test for four months
 +  * A named product with a specified customer base realizes this specification
 +
 +Submitters SHALL demonstrate the technical viability of their proposal to the satisfaction of the Task Force managing the evaluation process.
 +
 +OMG favours proposals based on technology for which sufficient relevant experience has been gained.
 +
 +---
 +
 +<WRAP centeralign>
 +© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.
 +</WRAP>