public:00-sip-ra:04-instructions-for-submitters:04-6-responding-to-rfp-items:04-6-1-complete-proposals:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
public:00-sip-ra:04-instructions-for-submitters:04-6-responding-to-rfp-items:04-6-1-complete-proposals:start [2026/09/12 18:33] – removed - external edit (Unknown date) 127.0.0.1public:00-sip-ra:04-instructions-for-submitters:04-6-responding-to-rfp-items:04-6-1-complete-proposals:start [2026/09/12 18:34] (current) – ↷ Links adapted because of a move operation nick_dido
Line 1: Line 1:
 +====== 4.6.1 Complete Proposals ======
 +
 +[[public:00-sip-ra:04-instructions-for-submitters:04-6-responding-to-rfp-items:start|Return to Responding to RFP Items]]
 +
 +Submissions SHOULD propose full specifications for all relevant requirements detailed in [[public:00-sip-ra:06-specific-requirements-on-proposals:start|Section 6 Specific Requirements on Proposals]].
 +
 +Submissions that do not present complete proposals may be at a disadvantage.
 +
 +Submitters are encouraged to include any non-mandatory features listed in [[public:00-sip-ra:06-specific-requirements-on-proposals:start|Section 6 Specific Requirements on Proposals]].
 +
 +----
 +
 +<WRAP centeralign>
 +© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.
 +</WRAP>