Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision | |||
| public:00-sip-ra:04-instructions-for-submitters:04-5-business-committee-terms:04-5-2-business-committee-evaluation-criteria:04-5-2-3-access-to-intellectual-property-rights:start [2026/09/12 18:33] – ↷ Page moved from dido:00-sip-ra:04-instructions-for-submitters:04-5-business-committee-terms:04-5-2-business-committee-evaluation-criteria:04-5-2-3-access-to-intellectual-property-rights:start to public:00-sip-ra:04-instructions-for-submitters:04-5-busin nick_dido | public:00-sip-ra:04-instructions-for-submitters:04-5-business-committee-terms:04-5-2-business-committee-evaluation-criteria:04-5-2-3-access-to-intellectual-property-rights:start [2026/09/12 18:34] (current) – ↷ Links adapted because of a move operation nick_dido | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| ====== 4.5.2.3 Access to Intellectual Property Rights ====== | ====== 4.5.2.3 Access to Intellectual Property Rights ====== | ||
| - | [[dido: | + | [[public: |
| OMG does not adopt a specification if OMG is aware of any submitter, member, or third party that holds a patent, copyright, or other intellectual property right, collectively referred to in this policy statement as Intellectual Property Rights (IPR), that might be infringed by implementation or recommendation of the specification, | OMG does not adopt a specification if OMG is aware of any submitter, member, or third party that holds a patent, copyright, or other intellectual property right, collectively referred to in this policy statement as Intellectual Property Rights (IPR), that might be infringed by implementation or recommendation of the specification, | ||