public:00-sip-ra:03-adoption-process:03-1-introduction:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
public:00-sip-ra:03-adoption-process:03-1-introduction:start [2026/09/12 18:33] – ↷ Page moved from dido:00-sip-ra:03-adoption-process:03-1-introduction:start to public:00-sip-ra:03-adoption-process:03-1-introduction:start nick_didopublic:00-sip-ra:03-adoption-process:03-1-introduction:start [2026/09/13 17:43] (current) – nick_dido
Line 1: Line 1:
 ====== 3.1 Introduction ====== ====== 3.1 Introduction ======
  
-[[dido:00-sip-ra:03-adoption-process:start|Return to Adoption Process]]+[[public:00-sip-ra:03-adoption-process:start|Return to Adoption Process]]
  
-[[https://www.omg.org/|OMG]] decides which specifications to adopt via votes of its Membership. The selected specifications should align with [[public:99_annexes:annex-b-terms-and-definitions:m:mda|MDA]]'s architectural vision. OMG bases its decisions on both business and technical considerations. Once OMG adopts a specification, OMG makes the specification available for use by both OMG members and non-members alike, at no charge.+[[https://www.omg.org/|OMG]] decides which specifications to adopt via votes of its Membership. The selected specifications should align with [[public:99_annexes:annex-b-terms-and-definitions:m:mda|MDA]]'s architectural vision. OMG bases its decisions on both business and technical considerations. Once OMG adopts a specification, it makes the specification available to OMG members and non-members alike, at no charge.
  
-Section 3 provides an extended summary of the RFP process. For more detailed information, see the Policies and Procedures of the OMG Technical Process [P&P], specifically Section 4.2, and the OMG Hitchhiker’s Guide [Guide]. In the event of any inconsistency between this document, the Hitchhiker's Guide, and the Policies and Procedures, the P&P is always authoritative. OMG's Intellectual Property Rights Policy [IPR] governs all IPR-related matters.+Section 3 provides an extended summary of the RFP process. For more detailed information, see the Policies and Procedures of the OMG Technical Process [P&P], specifically Section 4.2, and the OMG Hitchhiker’s Guide [Guide]. If any inconsistency exists between this document, the Hitchhiker's Guide, and the Policies and Procedures, the P&P is always authoritative. OMG's Intellectual Property Rights Policy [IPR] governs all IPR-related matters.
  
 ---- ----
  • public/00-sip-ra/03-adoption-process/03-1-introduction/start.1789263203.txt.gz
  • Last modified: 2026/09/12 18:33
  • by nick_dido