public:00-sip-ra:03-adoption-process:03-1-introduction:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
public:00-sip-ra:03-adoption-process:03-1-introduction:start [2026/09/12 18:33] – removed - external edit (Unknown date) 127.0.0.1public:00-sip-ra:03-adoption-process:03-1-introduction:start [2026/09/13 17:43] (current) – nick_dido
Line 1: Line 1:
 +====== 3.1 Introduction ======
 +
 +[[public:00-sip-ra:03-adoption-process:start|Return to Adoption Process]]
 +
 +[[https://www.omg.org/|OMG]] decides which specifications to adopt via votes of its Membership. The selected specifications should align with [[public:99_annexes:annex-b-terms-and-definitions:m:mda|MDA]]'s architectural vision. OMG bases its decisions on both business and technical considerations. Once OMG adopts a specification, it makes the specification available to OMG members and non-members alike, at no charge.
 +
 +Section 3 provides an extended summary of the RFP process. For more detailed information, see the Policies and Procedures of the OMG Technical Process [P&P], specifically Section 4.2, and the OMG Hitchhiker’s Guide [Guide]. If any inconsistency exists between this document, the Hitchhiker's Guide, and the Policies and Procedures, the P&P is always authoritative. OMG's Intellectual Property Rights Policy [IPR] governs all IPR-related matters.
 +
 +----
 +
 +<WRAP centeralign>
 +© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.
 +</WRAP>