public:00-sip-ra:01-introduction:01-2-organization-of-this-document:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
public:00-sip-ra:01-introduction:01-2-organization-of-this-document:start [2026/09/12 18:33] – ↷ Page moved from dido:00-sip-ra:01-introduction:01-2-organization-of-this-document:start to public:00-sip-ra:01-introduction:01-2-organization-of-this-document:start nick_didopublic:00-sip-ra:01-introduction:01-2-organization-of-this-document:start [2026/09/12 18:34] (current) – ↷ Links adapted because of a move operation nick_dido
Line 1: Line 1:
 ====== 1.2 Organization of this Document ====== ====== 1.2 Organization of this Document ======
  
-[[dido:00-sip-ra:01-introduction:start|Return to Introduction]]+[[public:00-sip-ra:01-introduction:start|Return to Introduction]]
  
 The remainder of this document is organized as follows: The remainder of this document is organized as follows:
  
 ^ Section ^ Description ^ ^ Section ^ Description ^
-| [[dido:00-sip-ra:02-architectural-context:start|Section 2: Architectural Context]] | Background information on OMG’s Model Driven Architecture | +| [[public:00-sip-ra:02-architectural-context:start|Section 2: Architectural Context]] | Background information on OMG’s Model Driven Architecture | 
-| [[dido:00-sip-ra:03-adoption-process:start|Section 3: Adoption Process]] | Background information on the OMG specification adoption process | +| [[public:00-sip-ra:03-adoption-process:start|Section 3: Adoption Process]] | Background information on the OMG specification adoption process | 
-| [[dido:00-sip-ra:04-instructions-for-submitters:start|Section 4: Instructions for Submitters]] | Explanation of how to make a submission to this RFP | +| [[public:00-sip-ra:04-instructions-for-submitters:start|Section 4: Instructions for Submitters]] | Explanation of how to make a submission to this RFP | 
-| [[dido:00-sip-ra:05-general-requirements-on-proposals:start|Section 5: General Requirements on Proposals]] | Requirements and evaluation criteria that apply to all proposals submitted to OMG | +| [[public:00-sip-ra:05-general-requirements-on-proposals:start|Section 5: General Requirements on Proposals]] | Requirements and evaluation criteria that apply to all proposals submitted to OMG | 
-| [[dido:00-sip-ra:06-specific-requirements-on-proposals:start|Section 6: Specific Requirements on Proposals]] | Problem statement, scope of proposals sought, mandatory requirements, non-mandatory features, issues to be discussed, evaluation criteria, and timetable that apply specifically to this RFP | +| [[public:00-sip-ra:06-specific-requirements-on-proposals:start|Section 6: Specific Requirements on Proposals]] | Problem statement, scope of proposals sought, mandatory requirements, non-mandatory features, issues to be discussed, evaluation criteria, and timetable that apply specifically to this RFP | 
-| [[dido:00-sip-ra:appendix-a-references-and-glossary-specific-to-this-rfp:start|Appendix A: References and Glossary Specific to this RFP]] | References and glossary specific to this RFP | +| [[public:00-sip-ra:appendix-a-references-and-glossary-specific-to-this-rfp:start|Appendix A: References and Glossary Specific to this RFP]] | References and glossary specific to this RFP | 
-| [[dido:00-sip-ra:appendix-b-general-references-and-glossary:start|Appendix B: General References and Glossary]] | General references and glossary |+| [[public:00-sip-ra:appendix-b-general-references-and-glossary:start|Appendix B: General References and Glossary]] | General references and glossary |
  
 --- ---
  • public/00-sip-ra/01-introduction/01-2-organization-of-this-document/start.1789263203.txt.gz
  • Last modified: 2026/09/12 18:33
  • by nick_dido