| dido:03-dido-te:99-annexes:annex-c-requirements:03-functional-requirements:03-02-node-requirements:nod-004-control-the-node-lifecycle:nod-004c-confirm-node-readiness [2026/08/17 14:20] – removed - external edit (Unknown date) 127.0.0.1 | dido:03-dido-te:99-annexes:annex-c-requirements:03-functional-requirements:03-02-node-requirements:nod-004-control-the-node-lifecycle:nod-004c-confirm-node-readiness [2026/08/17 14:20] (current) – ↷ Links adapted because of a move operation nick_dido | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| + | ====== NOD-004c — Confirm Node Readiness ====== | ||
| + | [[dido: | ||
| + | |||
| + | ===== Statement ===== | ||
| + | |||
| + | The [[dido: | ||
| + | |||
| + | ===== Derived From ===== | ||
| + | |||
| + | * [[dido: | ||
| + | * [[dido: | ||
| + | * [[dido: | ||
| + | * [[dido: | ||
| + | * [[dido: | ||
| + | * [[dido: | ||
| + | |||
| + | ===== Rationale ===== | ||
| + | |||
| + | Node readiness identifies whether a started Node satisfies the conditions required to perform its assigned role within a [[dido: | ||
| + | |||
| + | A completed start operation establishes that the startup procedure reached an endpoint. It does not demonstrate that the Node has initialized its required services, established its [[dido: | ||
| + | |||
| + | Readiness criteria derive from the [[dido: | ||
| + | |||
| + | Confirming readiness prevents a partially initialized, | ||
| + | |||
| + | ===== Applies To ===== | ||
| + | |||
| + | * [[dido: | ||
| + | * [[dido: | ||
| + | * [[dido: | ||
| + | * [[dido: | ||
| + | * [[dido: | ||
| + | * [[dido: | ||
| + | * [[dido: | ||
| + | * [[dido: | ||
| + | * [[dido: | ||
| + | * [[dido: | ||
| + | * [[dido: | ||
| + | * [[dido: | ||
| + | * [[dido: | ||
| + | * [[dido: | ||
| + | |||
| + | ===== Verification ===== | ||
| + | |||
| + | Verification confirms that: | ||
| + | |||
| + | * The DIDO-TE uniquely identifies the Node subject to readiness confirmation. | ||
| + | * The Node has completed its authorized start operation. | ||
| + | * The DIDO-TE identifies the Node Definition, Node Implementation, | ||
| + | * The DIDO-TE uses identified and authorized readiness criteria and procedures. | ||
| + | * The readiness criteria define the required Node state, services, interfaces, Node Bindings, Dependencies, | ||
| + | * The DIDO-TE evaluates the actual Node state against the applicable readiness criteria. | ||
| + | * The DIDO-TE confirms that each mandatory service and interface is active and responsive. | ||
| + | * The DIDO-TE confirms that each mandatory Node Binding is established and available. | ||
| + | * The DIDO-TE confirms that each mandatory Dependency and Test Resource is available and compatible. | ||
| + | * The DIDO-TE confirms that the Node occupies the required lifecycle state. | ||
| + | * The DIDO-TE confirms that the Node Configuration corresponds to the configuration approved for the applicable Test Execution. | ||
| + | * The DIDO-TE confirms that the Node satisfies applicable security, access-control, | ||
| + | * The DIDO-TE confirms that the Node remains stable for any required observation period. | ||
| + | * The DIDO-TE distinguishes a successful start result from a successful readiness result. | ||
| + | * The DIDO-TE detects an incomplete, unsuccessful, | ||
| + | * The DIDO-TE detects a Node that becomes unready after readiness has been confirmed. | ||
| + | * The DIDO-TE prevents a Node without a current and successful readiness result from participating in Test Execution. | ||
| + | * A material change to the Node Definition, Node Implementation, | ||
| + | * The DIDO-TE records each readiness criterion, procedure, observation, | ||
| + | * Repeated readiness determinations for an unchanged Node under equivalent conditions produce equivalent results within specified tolerances. | ||
| + | * The DIDO-TE maintains Traceability among the readiness criteria, readiness procedure, Node Definition, Node Implementation, | ||
| + | * An unready, incompletely assessed, unsuccessfully assessed, unauthorized, | ||
| + | |||
| + | Verification includes: | ||
| + | |||
| + | * Inspection of the Node identity and completed start result | ||
| + | * Inspection of the authorized readiness criteria and procedure | ||
| + | * Observation of the actual Node state | ||
| + | * Confirmation of required services, interfaces, Node Bindings, Dependencies, | ||
| + | * Confirmation of applicable security, access-control, | ||
| + | * Observation of the Node for the required stability period | ||
| + | * A negative assessment involving an unavailable mandatory service | ||
| + | * A negative assessment involving a missing or incompatible Node Binding | ||
| + | * A negative assessment involving an unavailable Dependency or Test Resource | ||
| + | * Confirmation that a Node without a successful readiness result cannot participate in Test Execution | ||
| + | * Confirmation that a material change invalidates the readiness result | ||
| + | * Inspection of readiness results, findings, exceptions, Evidence, and Traceability | ||
| + | |||
| + | ===== Referenced By ===== | ||
| + | |||
| + | {{backlinks> | ||
| + | |||
| + | ===== Related Architecture Sections ===== | ||
| + | |||
| + | * Add links to the architecture sections governing Node readiness, Node lifecycle states, Node Configuration, | ||
| + | |||
| + | ===== Delivery Phase ===== | ||
| + | |||
| + | < | ||
| + | |||
| + | ===== Requirement Status ===== | ||
| + | |||
| + | Draft | ||
| + | |||
| + | ===== Statement Reference ===== | ||
| + | |||
| + | Use the following syntax to reference this requirement’s Statement section from another DokuWiki page: | ||
| + | |||
| + | <code dokuwiki> | ||
| + | {{section> | ||
| + | </ | ||
| + | |||
| + | ---- | ||
| + | |||
| + | <WRAP centeralign> | ||
| + | © 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc. | ||
| + | </ | ||