dido:03-dido-te:99-annexes:annex-c-requirements:03-functional-requirements:03-01-test-environment-requirements:env-003-establish-controlled-starting-state:env-003e-provision-required-test-resources

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
dido:03-dido-te:99-annexes:annex-c-requirements:03-functional-requirements:03-01-test-environment-requirements:env-003-establish-controlled-starting-state:env-003e-provision-required-test-resources [2026/08/18 12:34] – removed - external edit (Unknown date) 127.0.0.1dido:03-dido-te:99-annexes:annex-c-requirements:03-functional-requirements:03-01-test-environment-requirements:env-003-establish-controlled-starting-state:env-003e-provision-required-test-resources [2026/08/18 12:34] (current) – ↷ Links adapted because of a move operation nick_dido
Line 1: Line 1:
 +====== ENV-003e — Provision Required Test Resources ======
  
 +[[dido:03-dido-te:99-annexes:annex-c-requirements:03-functional-requirements:03-01-test-environment-requirements:env-003-establish-controlled-starting-state:start|Go to ENV-003 — Establish Controlled Starting State]]
 +
 +===== Statement =====
 +
 +Before each [[dido:99_annexes:annex-b-terms-and-definitions:t:test_execution|Test Execution]], the [[dido:99_annexes:annex-b-terms-and-definitions:d:dido-te|DIDO-TE]] SHALL provision each [[dido:99_annexes:annex-b-terms-and-definitions:t:test_resource|Test Resource]] specified by the controlled descriptive information governing the applicable [[dido:99_annexes:annex-b-terms-and-definitions:t:test_environment|Test Environment]].
 +
 +===== Derived From =====
 +
 +  * [[dido:03-dido-te:99-annexes:annex-c-requirements:03-functional-requirements:03-01-test-environment-requirements:env-003-establish-controlled-starting-state:start|ENV-003 — Establish Controlled Starting State]]
 +  * [[dido:03-dido-te:99-annexes:annex-b-references:dte-005|[DTE5] DIDO-TE Requirements Register]], source requirement identifier and obligation to be assigned
 +  * [[dido:03-dido-te:99-annexes:annex-b-references:dte-006|[DTE6] Structured Information Processing Reference Architecture (SIP-RA)]]
 +  * [[dido:03-dido-te:99-annexes:annex-b-references:dte-007|[DTE7] Federated Data Interpretation Systems Reference Architecture (FDIS-RA)]]
 +
 +===== Rationale =====
 +
 +Provisioning the required [[dido:99_annexes:annex-b-terms-and-definitions:t:test_resource|Test Resources]] supplies the infrastructure, services, software, data, devices, credentials, storage, network capacity, and supporting capabilities required by a [[dido:99_annexes:annex-b-terms-and-definitions:t:test_execution|Test Execution]].
 +
 +Each provisioned Test Resource must correspond to the type, quantity, capacity, version, location, and [[dido:99_annexes:annex-b-terms-and-definitions:c:configuration|Configuration]] specified by the controlled descriptive information.
 +
 +Controlled provisioning prevents missing, unsuitable, incorrectly configured, or unapproved resources from affecting Test Execution or the interpretation of the resulting [[dido:99_annexes:annex-b-terms-and-definitions:t:test_result|Test Results]].
 +
 +===== Applies To =====
 +
 +  * [[dido:99_annexes:annex-b-terms-and-definitions:t:test_environment|Test Environment]]
 +  * [[dido:99_annexes:annex-b-terms-and-definitions:t:test_definition|Test Definition]]
 +  * [[dido:99_annexes:annex-b-terms-and-definitions:t:test_execution|Test Execution]]
 +  * [[dido:99_annexes:annex-b-terms-and-definitions:t:test_resource|Test Resource]]
 +  * [[dido:99_annexes:annex-b-terms-and-definitions:t:test_object|Test Object]]
 +  * [[dido:99_annexes:annex-b-terms-and-definitions:n:node|Node]]
 +  * [[dido:99_annexes:annex-b-terms-and-definitions:b:baseline|Baseline]]
 +  * [[dido:99_annexes:annex-b-terms-and-definitions:c:configuration|Configuration]]
 +  * [[dido:99_annexes:annex-b-terms-and-definitions:d:deployment_target|Deployment Target]]
 +
 +===== Verification =====
 +
 +Verification confirms that:
 +
 +  * The controlled descriptive information identifies each Test Resource required for the Test Execution.
 +  * The controlled descriptive information specifies the required type, quantity, capacity, version, location, Configuration, and availability of each Test Resource.
 +  * The DIDO-TE provisions each required Test Resource before Test Execution.
 +  * Each provisioned Test Resource corresponds to its specified characteristics.
 +  * Each provisioned Test Resource is available to the applicable Node, Test Object, or Test Procedure.
 +  * The provisioned Test Resources exclude unapproved, obsolete, conflicting, and prohibited resources.
 +  * The DIDO-TE records the identity, version, Configuration, location, provisioning status, and availability of each Test Resource.
 +  * The DIDO-TE maintains [[dido:99_annexes:annex-b-terms-and-definitions:t:traceability|Traceability]] among each required Test Resource, its specification, its consumer, the Test Environment, and the applicable Test Execution.
 +  * A missing, unavailable, unsuitable, incorrectly configured, unapproved, obsolete, or untraceable Test Resource constitutes nonconformance with this requirement.
 +
 +Verification includes:
 +
 +  * Inspection of the controlled descriptive information identifying each required Test Resource
 +  * Inspection of the specified characteristics of each Test Resource
 +  * Observation of Test Resource provisioning
 +  * Comparison of each provisioned Test Resource with its specified type, quantity, capacity, version, location, and Configuration
 +  * Confirmation of Test Resource availability to the applicable Node, Test Object, or Test Procedure
 +  * Inspection for unapproved, obsolete, conflicting, and prohibited Test Resources
 +  * Inspection of Test Resource identity, version, Configuration, location, provisioning-status, and availability records
 +  * Inspection of Traceability records connecting each Test Resource to its specification, consumer, Test Environment, and Test Execution
 +  * A negative assessment using a missing, unavailable, unsuitable, incorrectly configured, unapproved, obsolete, or untraceable Test Resource
 +  * Confirmation that the negative assessment produces a nonconformance result
 +
 +===== Referenced By =====
 +
 +{{backlinks>.}}
 +
 +===== Related Architecture Sections =====
 +
 +  * Add links to the architecture sections governing Test Resource specification, provisioning, Configuration, availability, Deployment Targets, and Test Execution admission.
 +
 +===== Delivery Phase =====
 +
 +Assign the applicable delivery phase.
 +
 +===== Requirement Status =====
 +
 +Draft
 +
 +===== Statement Reference =====
 +
 +Use the following syntax to reference this requirement’s Statement section from another DokuWiki page:
 +
 +<code dokuwiki>
 +{{section>dido:03-dido-te:99-annexes:annex-c-requirements:02-test-environment-requirements:env-003-establish-controlled-starting-state:env-003e-provision-required-test-resources#Statement&noheader&nofooter&noeditbtn}}
 +</code>
 +
 +----
 +
 +<WRAP centeralign>
 +© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.
 +</WRAP>