Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
| dido:03-dido-te:99-annexes:annex-c-requirements:01-mission-objectives:mo-007:start [2026/08/06 11:48] – ↷ Page moved and renamed from dido:03-dido-te:99-annexes:annex-c-requirements:01-mission-objectives:mo-007 to dido:03-dido-te:99-annexes:annex-c-requirements:01-mission-objectives:mo-007:start nick_dido | dido:03-dido-te:99-annexes:annex-c-requirements:01-mission-objectives:mo-007:start [2026/08/06 12:12] (current) – nick_dido | ||
|---|---|---|---|
| Line 3: | Line 3: | ||
| [[dido: | [[dido: | ||
| - | ===== Statement | + | ===== Original Requirement |
| - | [[dido: | + | > //[[dido: |
| - | ===== Derived From ===== | + | ===== Assessment of Original Requirement |
| - | MO-007 derives from the DIDO-TE | + | The Original Requirement preserves |
| - | MO-007 decomposes into: | + | The following Specification Discipline and Authoring findings apply: |
| - | * [[dido:03-dido-te:99-annexes: | + | * **Support** is a weak verb that does not identify an observable DIDO-TE behavior |
| - | * [[dido:03-dido-te: | + | * **Testing operations** does not identify the operations DIDO-TE performs within each environment type |
| - | * [[dido: | + | * The requirement combines operation in Connected Environments, |
| + | * The requirement does not identify the distinct connectivity, | ||
| + | * A single verification result could obscure failure to operate in one or more required environment types | ||
| - | ===== Rationale ===== | + | The Original Requirement identifies: |
| - | Organizations conduct development, | + | * [[dido: |
| + | * [[dido: | ||
| + | * [[dido: | ||
| - | A Connected Environment provides access to permitted external networks and services. A Disconnected Environment operates without active external network connectivity during the relevant | + | The decomposition treats |
| - | Support for all three environment types enables DIDO-TE to test [[dido: | + | The three environment types impose |
| - | + | ||
| - | The three environment types impose | + | |
| * Access to external networks and services | * Access to external networks and services | ||
| Line 32: | Line 34: | ||
| * Configuration and execution of tests | * Configuration and execution of tests | ||
| * Collection and removal of Test Results | * Collection and removal of Test Results | ||
| - | * Collection and preservation of logs and [[dido: | + | * Collection and preservation of logs and Evidence |
| * Integrity, provenance, and [[dido: | * Integrity, provenance, and [[dido: | ||
| * Application of security and authorization controls | * Application of security and authorization controls | ||
| - | The child requirements define the obligations applicable | + | The Original Requirement does not identify which testing operations apply to all three environment |
| - | ===== Applies To ===== | + | The Original Requirement therefore requires: |
| - | MO-007 | + | * Replacement of **support** with observable DIDO-TE behaviors |
| + | * Identification of the testing operations required within each environment type | ||
| + | * Separation of the three independently testable environment obligations | ||
| + | * Identification of the transfer controls applicable to Disconnected and Air-Gapped Environments | ||
| + | * Identification of the connectivity and external-service dependencies permitted within each environment type | ||
| + | * Confirmation that the derived requirements collectively preserve the complete intent of MO-007 | ||
| - | * DIDO-TE | + | The decomposition preserves '' |
| - | * Test Environments | + | |
| - | * Connected Environments | + | |
| - | * Disconnected Environments | + | |
| - | * Air-Gapped Environments | + | |
| - | * Test Definitions | + | |
| - | * Transfer Bundles | + | |
| - | * Candidate Solutions | + | |
| - | * Test execution | + | |
| - | * Test Results | + | |
| - | * Evidence | + | |
| - | * Environment-specific operating procedures | + | |
| - | ===== Verification | + | ===== Proposed Statements |
| - | Verification confirms that: | + | The Original Requirement is decomposed into the following proposed replacement requirements: |
| - | | + | {{indexmenu> |
| - | | + | |
| - | | + | |
| - | | + | |
| - | - The child requirements address the introduction of required testing artifacts and the collection of Test Results and Evidence under the applicable connectivity and isolation conditions | + | |
| - | ===== Referenced By ===== | + | ===== Requirement Status |
| - | The following pages reference this requirement: | + | < |
| - | {{backlinks>.#dido:03-dido-te}} | + | <todo>Determine whether MO-007a through MO-007c collectively supersede MO-007.</ |
| - | ===== Delivery Phase ===== | + | < |
| - | < | + | ---- |
| - | ===== Implementation Status | + | ===== Issues |
| - | < | + | The following unresolved issues affect |
| - | ===== Requirement Status ===== | + | < |
| - | < | + | < |
| - | ===== Contents ===== | + | < |
| - | {{indexmenu>dido:03-dido-te:99-annexes: | + | <todo>Determine which testing operations apply uniformly across Connected, Disconnected, |
| + | |||
| + | < | ||
| + | |||
| + | < | ||
| ---- | ---- | ||
| - | ===== Issues | + | ===== Notes for Editors |
| - | < | + | This page should retain |
| - | < | + | This page is a non-leaf requirement page and retains a trailing '': |
| - | < | + | The child requirements |
| - | ---- | + | This page preserves: |
| - | ===== Notes for Editors ===== | + | * The Original Requirement |
| + | * The assessment of the Original Requirement | ||
| + | * The reason | ||
| + | * Traceability to the proposed replacement requirements | ||
| + | * The unresolved cross-cutting issues affecting the decomposition | ||
| + | * The supersession decision | ||
| - | MO-007 is a non-leaf requirement page. Its child requirements | + | The proposed |
| - | The explicit child links remain in the Derived From section to document the normative decomposition. The Contents section dynamically lists the child pages. | + | * '' |
| + | * '' | ||
| + | * '' | ||
| - | The MO-007 | + | The Original Requirement should not be marked as superseded until the requirement owner: |
| + | |||
| + | * Approves the three child requirements | ||
| + | * Confirms that the child requirements collectively preserve the complete approved intent of MO-007 | ||
| + | * Confirms that each required testing operation has been allocated to one or more child requirements | ||
| + | * Confirms that no additional child requirements are required | ||
| + | |||
| + | After supersession, | ||
| + | |||
| + | Material changes to the decomposition should update the child requirements, | ||
| + | |||
| + | The non-leaf page namespace is: | ||
| < | < | ||
| dido: | dido: | ||
| </ | </ | ||
| - | |||
| - | The child requirement namespaces omit `:start`. | ||
| ---- | ---- | ||