Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
| dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-006:mo-006b [2026/07/21 09:57] – ↷ Links adapted because of a move operation nick_dido | dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-006:mo-006b [2026/07/30 05:28] (current) – [Delivery Phase] nick_dido | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | ====== MO-006b — Operational | + | ====== MO-006b — Infrastructure |
| [[dido: | [[dido: | ||
| Line 5: | Line 5: | ||
| ===== Statement ===== | ===== Statement ===== | ||
| - | [[dido: | + | [[dido: |
| ===== Derived From ===== | ===== Derived From ===== | ||
| Line 17: | Line 17: | ||
| > //The system SHALL support infrastructure lifecycle management from initial deployment through retirement.// | > //The system SHALL support infrastructure lifecycle management from initial deployment through retirement.// | ||
| - | MO-006b preserves the lifecycle-initiation boundary expressed by **from initial deployment** in the Original Requirement by identifying the initial Infrastructure Deployment as the first stage of the assigned | + | MO-006b preserves the lifecycle-initiation boundary expressed by **from initial deployment** in the Original Requirement by identifying the initial Infrastructure Deployment as the first stage of the associated |
| The separate requirements derived from MO-006 address: | The separate requirements derived from MO-006 address: | ||
| - | * [[dido: | + | * [[dido: |
| - | * [[dido: | + | * [[dido: |
| - | * [[dido: | + | * [[dido: |
| * [[dido: | * [[dido: | ||
| - | |||
| - | ===== Assessment ===== | ||
| - | |||
| - | The Original Requirement identifies **initial deployment** as the beginning of infrastructure lifecycle management but does not define the lifecycle-initiation relationship. | ||
| - | |||
| - | Without an explicit initiation boundary, an evaluator cannot reliably determine: | ||
| - | |||
| - | * When the assigned Operational Lifecycle begins | ||
| - | * Whether lifecycle management begins before, during, or after the initial Infrastructure Deployment | ||
| - | * Which Infrastructure Deployment constitutes the initial deployment | ||
| - | * Which Infrastructure Environment the initial deployment creates | ||
| - | * Which Operational Lifecycle applies when deployment begins | ||
| - | * Whether pre-deployment planning belongs to the Operational Lifecycle | ||
| - | * Whether a redeployment creates a new Operational Lifecycle | ||
| - | * The Evidence required to demonstrate lifecycle initiation | ||
| - | |||
| - | The phrase **from initial deployment** embeds a separate lifecycle-initiation obligation within the broader lifecycle-management requirement. | ||
| - | |||
| - | MO-006b: | ||
| - | |||
| - | * Identifies [[dido: | ||
| - | * Identifies the initial Infrastructure Deployment as the lifecycle-initiation stage | ||
| - | * Identifies the assigned Operational Lifecycle as the lifecycle being initiated | ||
| - | * Avoids ambiguity between deployment start and deployment completion by treating the initial Infrastructure Deployment as a lifecycle stage | ||
| - | * Separates lifecycle initiation from lifecycle assignment, current-state determination, | ||
| ===== Rationale ===== | ===== Rationale ===== | ||
| - | The initial [[dido: | + | The initial [[dido: |
| - | Designating the initial Infrastructure Deployment as the first stage of the assigned | + | Designating the initial Infrastructure Deployment as the first stage of the associated |
| The initial Infrastructure Deployment can include: | The initial Infrastructure Deployment can include: | ||
| - | * Selection of the applicable | + | * Selection of the Infrastructure Baseline |
| * Preparation of deployment inputs | * Preparation of deployment inputs | ||
| * Provisioning of infrastructure resources | * Provisioning of infrastructure resources | ||
| Line 65: | Line 40: | ||
| * Application of security controls | * Application of security controls | ||
| * Application of compliance controls | * Application of compliance controls | ||
| - | * Deployment | + | * Deployment |
| * Evidence generation | * Evidence generation | ||
| - | * Establishment of the initial | + | * Establishment of the initial |
| Lifecycle initiation supports: | Lifecycle initiation supports: | ||
| - | * Consistent treatment of the initial Infrastructure Deployment | ||
| * Identification of the first lifecycle stage | * Identification of the first lifecycle stage | ||
| - | * Association of deployment | + | * Association of deployment |
| * Determination of subsequent lifecycle states | * Determination of subsequent lifecycle states | ||
| * Controlled execution of lifecycle transitions | * Controlled execution of lifecycle transitions | ||
| Line 79: | Line 53: | ||
| * Preservation of [[dido: | * Preservation of [[dido: | ||
| * Maintenance of [[dido: | * Maintenance of [[dido: | ||
| - | * Generation of auditable [[dido: | ||
| - | Pre-deployment planning, design, approval, and preparation | + | Pre-deployment planning, design, approval, and preparation |
| - | A subsequent deployment | + | A subsequent deployment does not automatically |
| - | This requirement does not assign | + | This requirement does not associate |
| - | This requirement does not determine | + | This requirement does not record |
| - | This requirement does not execute transitions following | + | This requirement does not execute |
| - | This requirement does not establish Retirement. MO-006e | + | This requirement does not retire the Infrastructure Environment. MO-006e |
| ===== Applies To ===== | ===== Applies To ===== | ||
| Line 102: | Line 75: | ||
| * Initial Infrastructure Deployments | * Initial Infrastructure Deployments | ||
| * [[dido: | * [[dido: | ||
| - | * Operational Lifecycle | + | * Operational Lifecycle |
| * Operational Lifecycle stages | * Operational Lifecycle stages | ||
| * Lifecycle-initiation records | * Lifecycle-initiation records | ||
| Line 109: | Line 82: | ||
| * Deployment Platforms | * Deployment Platforms | ||
| * Operational environments | * Operational environments | ||
| - | * Security profiles | ||
| - | * Compliance profiles | ||
| * [[dido: | * [[dido: | ||
| * [[dido: | * [[dido: | ||
| Line 119: | Line 90: | ||
| Verification confirms that: | Verification confirms that: | ||
| - | - The Infrastructure Environment is identified | + | - The [[dido: |
| - | - The assigned | + | - The associated [[dido: |
| - | - The initial Infrastructure Deployment is identified | + | - The initial |
| - | - The identified Infrastructure Deployment | + | - The identified Infrastructure Deployment first realizes the Infrastructure Environment |
| - | - The initial Infrastructure Deployment | + | - [[dido: |
| - The lifecycle-initiation relationship remains associated with the Infrastructure Environment | - The lifecycle-initiation relationship remains associated with the Infrastructure Environment | ||
| - | - The initiation | + | |
| + | | ||
| - | Verification includes: | + | ===== Referenced By ===== |
| - | * Infrastructure Environment inspection | + | The following pages reference this requirement: |
| - | * Operational Lifecycle assignment inspection | + | |
| - | * Initial Infrastructure Deployment inspection | + | |
| - | * Deployment-record inspection | + | |
| - | * Lifecycle-stage inspection | + | |
| - | * Lifecycle-initiation record inspection | + | |
| - | * Infrastructure Environment identity inspection | + | |
| - | * Subsequent-deployment comparison | + | |
| - | * Evidence inspection | + | |
| - | * Provenance inspection | + | |
| - | * Traceability inspection | + | |
| - | The verification record identifies: | + | {{backlinks> |
| - | - The Infrastructure Environment | + | ===== Delivery Phase ===== |
| - | - The assigned Operational Lifecycle | + | |
| - | - The Operational Lifecycle identifier | + | |
| - | - The Operational Lifecycle revision | + | |
| - | - The initial Infrastructure Deployment | + | |
| - | - The Infrastructure Deployment identifier | + | |
| - | - The lifecycle-initiation stage | + | |
| - | - The initiation date and time | + | |
| - | - The lifecycle-initiation record | + | |
| - | - The authority or process responsible for the designation | + | |
| - | - Each conflicting or missing initiation relationship | + | |
| - | - Each identified failure or exception | + | |
| - | - The observed result | + | |
| - | - The generated [[dido: | + | |
| - | ===== Requirements Realized By ===== | + | Implemented and Verified. |
| - | This requirement is realized by: | + | ===== Implementation Status ===== |
| - | * [[dido: | + | < |
| - | * [[dido: | + | |
| - | * [[dido: | + | |
| - | * [[dido: | + | |
| - | * [[dido: | + | |
| - | * [[dido: | + | |
| - | * [[dido: | + | |
| - | ===== Related Architecture Sections | + | ===== Requirement Status |
| - | * [[dido: | + | < |
| - | * [[dido: | + | |
| - | * [[dido: | + | |
| - | * [[dido: | + | |
| - | ===== Referenced By ===== | + | ---- |
| + | ===== Issues | ||
| - | The following | + | The following |
| - | {{backlinks>.# | + | <todo>Define the criteria used to identify the initial Infrastructure Deployment of an Infrastructure Environment.</ |
| - | ===== Delivery Phase ===== | + | < |
| - | Phase 1 and subsequent phases | + | < |
| - | ===== Implementation Status ===== | + | < |
| - | Not Assessed | + | < |
| - | Implementation status requires verification that the current [[dido: | + | < |
| - | + | ||
| - | ===== Requirement Status ===== | + | |
| - | + | ||
| - | Draft | + | |
| - | + | ||
| - | This requirement derives from MO-006 in the Crucible System Requirements Specification, | + | |
| ---- | ---- | ||
| Line 206: | Line 141: | ||
| This page is a leaf requirement page and omits a trailing '': | This page is a leaf requirement page and omits a trailing '': | ||
| - | Changes to the Statement should preserve the relationship between the initial Infrastructure Deployment and the first stage of the assigned Operational Lifecycle. | + | The parent MO-006 page is a non-leaf page and retains a trailing '': |
| + | |||
| + | Changes to the Statement should preserve: | ||
| + | |||
| + | * [[dido: | ||
| + | * The initial | ||
| + | * The [[dido: | ||
| + | * The associated [[dido: | ||
| + | * The first lifecycle | ||
| The lifecycle-initiation record should identify: | The lifecycle-initiation record should identify: | ||
| Line 214: | Line 157: | ||
| * The Operational Lifecycle revision | * The Operational Lifecycle revision | ||
| * The initial Infrastructure Deployment identifier | * The initial Infrastructure Deployment identifier | ||
| - | * The lifecycle-initiation | + | * The first lifecycle stage |
| * The initiation date and time | * The initiation date and time | ||
| * The authority or process responsible for the designation | * The authority or process responsible for the designation | ||
| - | * The applicable | + | * The Infrastructure Baseline |
| - | * The applicable | + | * The Deployment Platform |
| - | * The applicable | + | * The operational environment |
| - | * The associated Provenance | + | * The associated |
| - | * The associated Traceability | + | * The associated |
| - | * The supporting Evidence | + | |
| - | Material changes should receive review and should update the related | + | Material changes should receive review and should update the verification criteria, |
| To reference this requirement Statement from another wiki page, insert: | To reference this requirement Statement from another wiki page, insert: | ||