Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
| dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-005:start [2026/07/20 09:10] – nick_dido | dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-005:start [2026/07/22 12:20] (current) – nick_dido | ||
|---|---|---|---|
| Line 14: | Line 14: | ||
| * **The system** does not use the defined system name [[dido: | * **The system** does not use the defined system name [[dido: | ||
| - | * **Establish** is a weak verb that does not identify | + | * **Establish** is a weak verb that does not identify |
| * **Infrastructure** does not identify the managed subject as an [[dido: | * **Infrastructure** does not identify the managed subject as an [[dido: | ||
| * **Asset** does not use the defined concept [[dido: | * **Asset** does not use the defined concept [[dido: | ||
| - | * **Reusable** does not identify the selection, application, | + | * **Reusable** does not identify the required |
| - | * **Version-controlled** combines | + | * **Version-controlled** combines |
| - | * The Original Requirement does not identify how each Infrastructure Baseline is uniquely identified | + | |
| - | * The Original Requirement does not identify how revisions of an Infrastructure Baseline are distinguished | + | |
| - | * The Original Requirement does not require selection of an approved Infrastructure Baseline for an Infrastructure Deployment | + | |
| - | * The Original Requirement does not identify the minimum number of Infrastructure Deployments required to demonstrate reuse | + | |
| - | * The Original Requirement does not prohibit modification of approved Infrastructure Baseline content during reuse | + | |
| - | * The Original Requirement does not require each Infrastructure Deployment to identify the Infrastructure Baseline revision used | + | |
| - | * The Original Requirement combines Artifact management, identification, | + | |
| - | * These obligations can pass or fail independently | + | |
| - | * The Original Requirement does not provide independently identifiable statements for verification and traceability | + | |
| - | The previously normalized Statement also combined: | + | The Original Requirement does not identify: |
| - | * Management of each Infrastructure Baseline as an Artifact | + | * How Crucible manages an Infrastructure Baseline as an Artifact |
| - | * Unique identification | + | * How Crucible uniquely identifies each Infrastructure Baseline |
| - | * Version Control | + | * How Crucible distinguishes Infrastructure Baseline revisions |
| - | * Selection | + | * How an approved Infrastructure Baseline revision is selected |
| - | * Reuse across multiple | + | * The minimum number of Infrastructure Deployments |
| - | * Preservation of approved | + | * Whether |
| - | * Traceability from each Infrastructure Deployment | + | * How each Infrastructure Deployment |
| - | These obligations can pass or fail independently. | + | The Original Requirement therefore requires: |
| - | The Original Requirement therefore requires decomposition into independently identifiable normative | + | * Replacement of **the system** with the defined system name [[dido: |
| + | * Replacement of **establish** with observable Crucible behavior | ||
| + | * Identification of the managed subject as an Infrastructure Baseline | ||
| + | * Management of each Infrastructure Baseline as an Artifact | ||
| + | * Unique identification of each Infrastructure Baseline | ||
| + | * Identification and preservation of Infrastructure Baseline revisions | ||
| + | * Selection of an approved Infrastructure Baseline revision for Infrastructure Deployment | ||
| + | * Reuse of an Infrastructure Baseline revision across multiple Infrastructure Deployments | ||
| + | * Preservation of approved Infrastructure Baseline content during reuse | ||
| + | * Traceability from each Infrastructure Deployment to the Infrastructure Baseline revision used | ||
| + | * Confirmation that the derived | ||
| - | The decomposition preserves '' | + | The decomposition preserves '' |
| ===== Proposed Statements ===== | ===== Proposed Statements ===== | ||
| - | The Original Requirement is replaced by the following | + | The Original Requirement is decomposed into the following |
| {{indexmenu> | {{indexmenu> | ||
| + | |||
| + | ===== Requirement Status ===== | ||
| + | |||
| + | < | ||
| + | |||
| + | < | ||
| + | |||
| + | < | ||
| + | |||
| + | ---- | ||
| + | ===== Issues ===== | ||
| + | |||
| + | The following unresolved issues affect the decomposition of MO-005: | ||
| + | |||
| + | < | ||
| + | |||
| + | < | ||
| + | |||
| + | < | ||
| + | |||
| + | < | ||
| + | |||
| + | < | ||
| + | |||
| + | < | ||
| + | |||
| + | < | ||
| + | |||
| + | < | ||
| + | |||
| + | < | ||
| + | |||
| + | ---- | ||
| + | ===== Notes for Editors ===== | ||
| + | |||
| + | This page should retain the stable parent requirement identifier '' | ||
| + | |||
| + | This page is a non-leaf requirement page and retains a trailing '': | ||
| + | |||
| + | The child requirements are leaf requirement pages and omit a trailing '': | ||
| + | |||
| + | The explicit child-page links should remain while the proposed decomposition is being developed. After the child pages have been created and finalized, the explicit links may be removed because the '' | ||
| + | |||
| + | This page preserves: | ||
| + | |||
| + | * The Original Requirement | ||
| + | * The assessment of the Original Requirement | ||
| + | * The reason for decomposition | ||
| + | * [[dido: | ||
| + | * The unresolved cross-cutting issues affecting the decomposition | ||
| + | * The supersession decision | ||
| + | |||
| + | The derived requirements should distinguish: | ||
| + | |||
| + | * Management of an Infrastructure Baseline as an Artifact | ||
| + | * Identification of an Infrastructure Baseline | ||
| + | * Identification and control of Infrastructure Baseline revisions | ||
| + | * Approval and selection of an Infrastructure Baseline revision | ||
| + | * Reuse of an Infrastructure Baseline revision | ||
| + | * Preservation of approved Infrastructure Baseline content | ||
| + | * Traceability from an Infrastructure Deployment to the Infrastructure Baseline revision used | ||
| + | |||
| + | Reuse does not mean modification of an approved Infrastructure Baseline revision. A required change should produce a new controlled revision rather than alter the approved revision already used by prior Infrastructure Deployments. | ||
| + | |||
| + | Infrastructure Baseline identification and Infrastructure Baseline revision identification are separate concerns. The baseline identifier identifies the managed baseline, while the revision identifier distinguishes one controlled state of that baseline from another. | ||
| + | |||
| + | The Original Requirement should not be marked as superseded until the requirement owner: | ||
| + | |||
| + | * Approves the proposed decomposition | ||
| + | * Approves the child requirements | ||
| + | * Defines the Infrastructure Baseline identification and revision-control rules | ||
| + | * Defines the approval and selection process | ||
| + | * Defines the minimum reuse condition | ||
| + | * Defines the preservation and change-control rules | ||
| + | * Defines the required Infrastructure Deployment Traceability record | ||
| + | * Confirms that the child requirements collectively preserve the complete approved intent of MO-005 | ||
| + | * Confirms that no additional child requirements are required | ||
| + | |||
| + | After supersession, | ||
| + | |||
| + | Material changes to the decomposition should update the child requirements, | ||
| ---- | ---- | ||