Differences
This shows you the differences between two versions of the page.
| Next revision | Previous revision | ||
| dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-002:mo-002b [2026/07/20 08:16] – created nick_dido | dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-002:mo-002b [2026/07/30 05:22] (current) – [Delivery Phase] nick_dido | ||
|---|---|---|---|
| Line 22: | Line 22: | ||
| * [[dido: | * [[dido: | ||
| - | |||
| - | ===== Assessment ===== | ||
| - | |||
| - | The Original Requirement uses **reduce** without identifying: | ||
| - | |||
| - | * The approved Deployment Baseline | ||
| - | * The baseline Platform Deployment process | ||
| - | * The baseline Deployment Duration | ||
| - | * The Platform Deployment selected for comparison | ||
| - | * The activities included in each measurement | ||
| - | * The starting event | ||
| - | * The completion event | ||
| - | * The Controlled Inputs | ||
| - | * The operational context | ||
| - | * The measurement method | ||
| - | * The degree of required reduction | ||
| - | * The treatment of failed, incomplete, interrupted, | ||
| - | |||
| - | The phrase **from months to days or hours** does not establish a controlled comparison because it does not identify a specific baseline duration or a specific measured duration. | ||
| - | |||
| - | MO-002b: | ||
| - | |||
| - | * Identifies the approved [[dido: | ||
| - | * Identifies the selected [[dido: | ||
| - | * Requires the selected Platform Deployment to complete in less time than the approved Deployment Baseline | ||
| - | * Requires equivalent measurement conditions for the baseline and measured Platform Deployments | ||
| - | * Separates relative duration reduction from the maximum-duration obligation established by MO-002a | ||
| - | * Removes **through automation** because the phrase prescribes an implementation approach rather than the required outcome | ||
| ===== Rationale ===== | ===== Rationale ===== | ||
| Line 55: | Line 27: | ||
| A claim that Crucible reduces Platform Deployment duration requires an approved and measurable comparison point. | A claim that Crucible reduces Platform Deployment duration requires an approved and measurable comparison point. | ||
| - | The approved [[dido: | + | The approved [[dido: |
| - | Equivalent measurement conditions include | + | Equivalent measurement conditions |
| + | |||
| + | Equivalent measurement conditions can include: | ||
| * Platform Deployment scope | * Platform Deployment scope | ||
| - | * Controlled Inputs | + | * [[dido: |
| * Starting event | * Starting event | ||
| * Completion event | * Completion event | ||
| Line 69: | Line 43: | ||
| * Measurement method | * Measurement method | ||
| * Measurement precision | * Measurement precision | ||
| - | * Treatment of failed, incomplete, interrupted, | + | * Treatment of failed, incomplete, interrupted, |
| - | The measured Platform Deployment satisfies this requirement when its Deployment Duration is less than the duration recorded by the approved Deployment Baseline under the applicable equivalent measurement conditions. | + | This requirement establishes a relative improvement over an approved Deployment Baseline. It does not establish the maximum permitted Deployment Duration. MO-002a |
| - | + | ||
| - | This requirement establishes a relative improvement over an approved Deployment Baseline. It does not establish the maximum permitted Deployment Duration. MO-002a | + | |
| ===== Applies To ===== | ===== Applies To ===== | ||
| Line 81: | Line 53: | ||
| * [[dido: | * [[dido: | ||
| * [[dido: | * [[dido: | ||
| + | * Selected Platform Deployments | ||
| * [[dido: | * [[dido: | ||
| * [[dido: | * [[dido: | ||
| + | * Equivalent measurement conditions | ||
| * [[dido: | * [[dido: | ||
| - | * [[dido: | + | * Platform Deployment scope |
| - | * [[dido: | + | * Platform Deployment starting events |
| - | * [[dido: | + | * Platform |
| - | * [[dido: | + | * Platform |
| - | * [[dido: | + | * Failed Platform Deployments |
| - | * [[dido: | + | * Incomplete Platform Deployments |
| - | * [[dido: | + | * Interrupted Platform Deployments |
| - | * [[dido: | + | * Repeated Platform Deployments |
| - | * [[dido: | + | |
| - | * [[dido: | + | |
| * [[dido: | * [[dido: | ||
| * [[dido: | * [[dido: | ||
| Line 102: | Line 74: | ||
| Verification confirms that: | Verification confirms that: | ||
| - | - The approved Deployment Baseline is uniquely identified | + | - The approved |
| - | - The approved | + | - The Deployment Baseline |
| - | - The approved | + | - The Deployment Baseline records the baseline |
| - | - The baseline and measured | + | - The selected [[dido: |
| - | - The baseline and measured | + | - The baseline and selected |
| - | - The baseline and measured | + | - The baseline and selected |
| - | - The baseline and measured | + | - The baseline and selected |
| - | - The baseline and measured | + | - The baseline and selected |
| - | - The baseline and measured | + | - The baseline and selected |
| + | - The baseline and selected | ||
| - The measured Deployment Duration is less than the Deployment Duration recorded by the approved Deployment Baseline | - The measured Deployment Duration is less than the Deployment Duration recorded by the approved Deployment Baseline | ||
| - | - Failed, incomplete, interrupted, | + | - Failed, incomplete, interrupted, |
| + | - The verification record preserves [[dido: | ||
| - | Verification includes: | + | ===== Referenced By ===== |
| - | * Deployment Baseline inspection | + | The following pages reference this requirement: |
| - | * Baseline Platform Deployment process inspection | + | |
| - | * Baseline duration inspection | + | |
| - | * Platform Deployment scope comparison | + | |
| - | * Controlled Input comparison | + | |
| - | * Starting-event comparison | + | |
| - | * Completion-event comparison | + | |
| - | * Included-activity comparison | + | |
| - | * Operational-context comparison | + | |
| - | * Computing-resource comparison | + | |
| - | * Network-condition comparison | + | |
| - | * Measurement-method comparison | + | |
| - | * Measurement-precision comparison | + | |
| - | * Starting-time capture | + | |
| - | * Completion-time capture | + | |
| - | * Elapsed-time calculation | + | |
| - | * Duration comparison | + | |
| - | * Deployment-result inspection | + | |
| - | * Repeated Platform Deployment tests | + | |
| - | * Evidence inspection | + | |
| - | * Provenance inspection | + | |
| - | * Traceability inspection | + | |
| - | The verification record identifies: | + | {{backlinks> |
| - | - The approved Deployment Baseline | + | ===== Delivery Phase ===== |
| - | - The Deployment Baseline identifier and revision | + | |
| - | - The baseline Platform Deployment process | + | |
| - | - The baseline Platform Deployment scope | + | |
| - | - The baseline Controlled Inputs | + | |
| - | - The baseline operational context | + | |
| - | - The baseline starting event | + | |
| - | - The baseline completion event | + | |
| - | - The baseline activities included in the measurement | + | |
| - | - The baseline measurement method | + | |
| - | - The baseline Deployment Duration | + | |
| - | - The measured Platform Deployment | + | |
| - | - The measured Platform Deployment scope | + | |
| - | - The measured Controlled Inputs | + | |
| - | - The measured operational context | + | |
| - | - The measured starting event | + | |
| - | - The measured completion event | + | |
| - | - The measured activities included in the measurement | + | |
| - | - The measured measurement method | + | |
| - | - The measured Deployment Duration | + | |
| - | - The difference between the baseline and measured Deployment Durations | + | |
| - | - The treatment of any failed, incomplete, interrupted, | + | |
| - | - The observed result | + | |
| - | - The generated [[dido: | + | |
| - | ===== Requirements Realized By ===== | + | Implemented and Verified |
| - | This requirement is realized by: | + | ===== Implementation Status ===== |
| - | * [[dido: | + | < |
| - | * [[dido: | + | |
| - | * [[dido: | + | |
| - | * [[dido: | + | |
| - | * [[dido: | + | |
| - | * [[dido: | + | |
| - | * [[dido: | + | |
| - | * [[dido: | + | |
| - | * [[dido: | + | |
| - | * [[dido: | + | |
| - | * [[dido: | + | |
| - | * [[dido: | + | |
| - | * [[dido: | + | |
| - | ===== Related Architecture Sections | + | ===== Requirement Status |
| - | * [[dido: | + | < |
| - | * [[dido: | + | |
| - | * [[dido: | + | |
| - | * [[dido: | + | |
| - | * [[dido: | + | |
| - | * [[dido: | + | |
| - | ===== Referenced By ===== | + | ---- |
| + | ===== Issues | ||
| - | The following | + | The following |
| - | {{backlinks>.# | + | <todo>Identify the approved Deployment Baseline and its controlling source.</ |
| - | ===== Delivery Phase ===== | + | < |
| - | Phase 1 and subsequent phases | + | < |
| - | ===== Implementation Status ===== | + | < |
| - | Not Assessed | + | < |
| - | + | ||
| - | Implementation status requires comparison of the current [[dido: | + | |
| - | + | ||
| - | ===== Requirement Status ===== | + | |
| - | + | ||
| - | Draft | + | |
| - | + | ||
| - | This requirement derives from MO-002 in the Crucible System Requirements Specification, | + | |
| ---- | ---- | ||
| Line 222: | Line 128: | ||
| This page is a leaf requirement page and omits a trailing '': | This page is a leaf requirement page and omits a trailing '': | ||
| - | Changes to the Statement | + | The parent MO-002 page is a non-leaf page and retains a trailing '': |
| + | |||
| + | Changes to the Statement | ||
| + | |||
| + | * [[dido: | ||
| + | * The selected [[dido: | ||
| + | * The approved [[dido: | ||
| + | * Equivalent measurement conditions for the baseline and selected Platform Deployments | ||
| + | * A measured Deployment Duration below the baseline Deployment Duration as the required outcome | ||
| The approved Deployment Baseline should identify: | The approved Deployment Baseline should identify: | ||
| - | * The Deployment Baseline identifier | + | * The Deployment Baseline identifier |
| - | * The Deployment Baseline | + | |
| * The baseline Platform Deployment process | * The baseline Platform Deployment process | ||
| * The baseline Platform Deployment scope | * The baseline Platform Deployment scope | ||
| Line 238: | Line 151: | ||
| * The baseline measurement precision | * The baseline measurement precision | ||
| * The baseline Deployment Duration | * The baseline Deployment Duration | ||
| - | * The treatment of failed, incomplete, interrupted, | + | * The treatment of failed, incomplete, interrupted, |
| - | * The supporting Evidence | + | |
| - | Material changes should receive review and should update the related | + | Material changes should receive review and should update the verification criteria, |
| To reference this requirement Statement from another wiki page, insert: | To reference this requirement Statement from another wiki page, insert: | ||