Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
| dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-001:start [2026/07/20 07:08] – removed - external edit (Unknown date) 127.0.0.1 | dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-001:start [2026/07/22 08:51] (current) – nick_dido | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| + | ====== MO-001 — Repeatable, Compliant, and Secure Infrastructure Environments ====== | ||
| + | [[dido: | ||
| + | |||
| + | ===== Original Requirement ===== | ||
| + | |||
| + | > //Crucible SHALL enable rapid creation of repeatable, compliant, and secure infrastructure environments.// | ||
| + | |||
| + | ===== Assessment of Original Requirement ===== | ||
| + | |||
| + | The Original Requirement preserves the approved mission objective but does not express independently testable normative statements. | ||
| + | |||
| + | The following Specification Discipline and Authoring findings apply: | ||
| + | |||
| + | * **Enable** is a weak verb that describes facilitation rather than an observable behavior performed by [[dido: | ||
| + | * **Rapid** does not identify a duration, threshold, baseline, or comparison method | ||
| + | * **Repeatable** does not identify the [[dido: | ||
| + | * **Compliant** does not identify the [[dido: | ||
| + | * **Secure** does not identify the [[dido: | ||
| + | |||
| + | The Original Requirement combines the following independently testable outcomes: | ||
| + | |||
| + | * Infrastructure Environment creation | ||
| + | * Deployment duration | ||
| + | * Repeatability | ||
| + | * Compliance | ||
| + | * Security | ||
| + | |||
| + | The Original Requirement does not identify the Controlled Inputs, baselines, thresholds, or evaluation criteria required to verify these outcomes. | ||
| + | |||
| + | The Original Requirement therefore requires: | ||
| + | |||
| + | * Replacement of **enable** with observable Crucible behavior | ||
| + | * Definition of the duration or performance criterion represented by **rapid** | ||
| + | * Identification of the Controlled Inputs and comparison criteria used to determine repeatability | ||
| + | * Identification of the Compliance Baseline and acceptance criteria used to determine compliance | ||
| + | * Identification of the Security Baseline and required controls used to determine security | ||
| + | * Separation of the independently testable outcomes | ||
| + | * Confirmation that the derived requirements collectively preserve the complete intent of MO-001 | ||
| + | |||
| + | The decomposition preserves '' | ||
| + | |||
| + | ===== Proposed Statements ===== | ||
| + | |||
| + | The Original Requirement is decomposed into independently identifiable proposed replacement requirements: | ||
| + | |||
| + | {{indexmenu> | ||
| + | |||
| + | ===== Requirement Status ===== | ||
| + | |||
| + | < | ||
| + | |||
| + | < | ||
| + | |||
| + | < | ||
| + | |||
| + | ---- | ||
| + | ===== Issues ===== | ||
| + | |||
| + | The following unresolved issues affect the decomposition of MO-001: | ||
| + | |||
| + | < | ||
| + | |||
| + | < | ||
| + | |||
| + | < | ||
| + | |||
| + | < | ||
| + | |||
| + | < | ||
| + | |||
| + | ---- | ||
| + | ===== Notes for Editors ===== | ||
| + | |||
| + | This page should retain the stable parent requirement identifier '' | ||
| + | |||
| + | This page is a non-leaf requirement page and retains a trailing '': | ||
| + | |||
| + | The child requirements are leaf requirement pages and omit a trailing '': | ||
| + | |||
| + | The '' | ||
| + | |||
| + | This page preserves: | ||
| + | |||
| + | * The Original Requirement | ||
| + | * The assessment of the Original Requirement | ||
| + | * The reason for decomposition | ||
| + | * [[dido: | ||
| + | * The unresolved cross-cutting issues affecting the decomposition | ||
| + | * The supersession decision | ||
| + | |||
| + | The Original Requirement should not be marked as superseded until the requirement owner: | ||
| + | |||
| + | * Approves the proposed decomposition | ||
| + | * Approves the child requirements | ||
| + | * Confirms that the child requirements collectively preserve the complete approved intent of MO-001 | ||
| + | * Confirms that no additional child requirements are required | ||
| + | |||
| + | After supersession, | ||
| + | |||
| + | Material changes to the decomposition should update the child requirements, | ||
| + | |||
| + | ---- | ||
| + | |||
| + | <WRAP centeralign> | ||
| + | © 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc. | ||
| + | </ | ||