dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-001:mo-001b

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-001:mo-001b [2026/07/20 07:53] nick_didodido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-001:mo-001b [2026/07/30 05:20] (current) – [Delivery Phase] nick_dido
Line 1: Line 1:
-====== MO-001a — Infrastructure Environment Creation ====== 
- 
-[[dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-001:start|Go to MO-001 — Repeatable, Compliant, and Secure Infrastructure Environments]] 
- 
-===== Statement ===== 
- 
-[[dido:99_annexes:annex-b-terms-and-definitions:c:crucible|Crucible]] SHALL create an [[dido:99_annexes:annex-b-terms-and-definitions:i:infrastructure_environment|Infrastructure Environment]] from the selected [[dido:99_annexes:annex-b-terms-and-definitions:c:controlled_input|Controlled Inputs]]. 
- 
-===== Derived From ===== 
- 
-This requirement derives from: 
 ====== MO-001b — Deployment Duration ====== ====== MO-001b — Deployment Duration ======
  
Line 16: Line 5:
 ===== Statement ===== ===== Statement =====
  
-[[dido:99_annexes:annex-b-terms-and-definitions:c:crucible|Crucible]] SHALL create an [[dido:99_annexes:annex-b-terms-and-definitions:i:infrastructure_environment|Infrastructure Environment]] within the applicable [[dido:99_annexes:annex-b-terms-and-definitions:d:deployment_duration|Deployment Duration]] [[dido:99_annexes:annex-b-terms-and-definitions:a:acceptance_criteria|Acceptance Criteria]].+[[dido:99_annexes:annex-b-terms-and-definitions:c:crucible|Crucible]] SHALL create an [[dido:99_annexes:annex-b-terms-and-definitions:i:infrastructure_environment|Infrastructure Environment]] within the [[dido:99_annexes:annex-b-terms-and-definitions:d:deployment_duration|Deployment Duration]] established by the [[dido:99_annexes:annex-b-terms-and-definitions:a:acceptance_criteria|Acceptance Criteria]].
  
 ===== Derived From ===== ===== Derived From =====
Line 28: Line 17:
 > //Crucible SHALL enable rapid creation of repeatable, compliant, and secure infrastructure environments.//[[dido:02-crusible:99-annexes:annex-b:cr-001|[C1]]] > //Crucible SHALL enable rapid creation of repeatable, compliant, and secure infrastructure environments.//[[dido:02-crusible:99-annexes:annex-b:cr-001|[C1]]]
  
-MO-001b preserves the portion of the Original Requirement that characterizes Infrastructure Environment creation as **rapid**.+MO-001b preserves the portion of the Original Requirement that characterizes Infrastructure Environment creation as **rapid** by requiring Crucible to satisfy a defined Deployment Duration.
  
 The separate requirements derived from MO-001 address: The separate requirements derived from MO-001 address:
Line 36: Line 25:
   * [[dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-001:mo-001d|MO-001d — Security Baseline Conformance]]   * [[dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-001:mo-001d|MO-001d — Security Baseline Conformance]]
   * [[dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-001:mo-001e|MO-001e — Compliance Baseline Conformance]]   * [[dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-001:mo-001e|MO-001e — Compliance Baseline Conformance]]
- 
-===== Assessment ===== 
- 
-The Original Requirement uses **rapid** without identifying: 
- 
-  * A defined start condition 
-  * A defined completion condition 
-  * A measurable duration 
-  * An applicable threshold 
-  * An operational context 
-  * A comparison baseline 
-  * Acceptance Criteria 
- 
-The term **rapid** therefore does not support objective verification. 
- 
-MO-001b: 
- 
-  * Replaces **rapid** with the measurable concept [[dido:99_annexes:annex-b-terms-and-definitions:d:deployment_duration|Deployment Duration]] 
-  * Identifies [[dido:99_annexes:annex-b-terms-and-definitions:c:crucible|Crucible]] as the responsible actor 
-  * Identifies creation of the [[dido:99_annexes:annex-b-terms-and-definitions:i:infrastructure_environment|Infrastructure Environment]] as the measured activity 
-  * Requires evaluation against applicable [[dido:99_annexes:annex-b-terms-and-definitions:a:acceptance_criteria|Acceptance Criteria]] 
-  * Separates deployment-duration performance from environment creation, reproducibility, security, and compliance outcomes 
  
 ===== Rationale ===== ===== Rationale =====
  
-Organizations require predictable Infrastructure Environment creation timelines to support development, testing, evaluation, deployment, recovery, and operational planning+Organizations require predictable Infrastructure Environment creation times to support development, testing, evaluation, deployment, recovery, and operational planning.
- +
-A qualitative term such as **rapid** does not establish an objective performance obligation. Deployment Duration provides a measurable quantity based on defined start and completion conditions.+
  
-The applicable Acceptance Criteria establish the duration threshold for the relevant operational contextDifferent Acceptance Criteria can apply to:+The word **rapid** does not establish an objective performance obligation. A defined [[dido:99_annexes:annex-b-terms-and-definitions:d:deployment_duration|Deployment Duration]] provides a measurable constraint based on an identified start condition, completion condition, and duration threshold.
  
-  * Different Infrastructure Environment types +The [[dido:99_annexes:annex-b-terms-and-definitions:a:acceptance_criteria|Acceptance Criteria]] establish the Deployment Duration against which Crucible is evaluated.
-  * Different deployment sizes +
-  * Different computing resources +
-  * Different network conditions +
-  * Connected Environments +
-  * Disconnected Environments +
-  * Air-Gapped Environments +
-  * Initial deployments +
-  * Repeated deployments +
-  * Recovery or replacement activities+
  
-Separating the duration requirement from MO-001a permits Crucible to satisfy the environment-creation requirement while independently passing or failing the applicable Deployment Duration Acceptance Criteria.+Separating deployment duration from Infrastructure Environment creation permits Crucible to satisfy the creation requirement while independently passing or failing the duration requirement.
  
-This requirement does not define the content of the Infrastructure Environment, the equivalence criteria used for Reproducibilityor the Security Baseline and Compliance Baseline applied to the Infrastructure Environment. The other requirements derived from MO-001 establish those outcomes.+This requirement does not define the content of the Infrastructure Environment, the equivalence criteria used for reproducibility, the [[dido:99_annexes:annex-b-terms-and-definitions:s:security_baseline|Security Baseline]], or the [[dido:99_annexes:annex-b-terms-and-definitions:c:compliance_baseline|Compliance Baseline]]. The other requirements derived from MO-001 address those outcomes.
  
 ===== Applies To ===== ===== Applies To =====
Line 96: Line 52:
   * [[dido:99_annexes:annex-b-terms-and-definitions:d:disconnected_environment|Disconnected Environments]]   * [[dido:99_annexes:annex-b-terms-and-definitions:d:disconnected_environment|Disconnected Environments]]
   * [[dido:99_annexes:annex-b-terms-and-definitions:a:air-gapped_environment|Air-Gapped Environments]]   * [[dido:99_annexes:annex-b-terms-and-definitions:a:air-gapped_environment|Air-Gapped Environments]]
-  * [[dido:99_annexes:annex-b-terms-and-definitions:c:ci_cd_pipeline|CI/CD Pipelines]] 
   * [[dido:99_annexes:annex-b-terms-and-definitions:e:evidence|Evidence]]   * [[dido:99_annexes:annex-b-terms-and-definitions:e:evidence|Evidence]]
   * [[dido:99_annexes:annex-b-terms-and-definitions:p:provenance|Provenance]]   * [[dido:99_annexes:annex-b-terms-and-definitions:p:provenance|Provenance]]
Line 105: Line 60:
 Verification confirms that: Verification confirms that:
  
-  - The applicable Deployment Duration Acceptance Criteria identify a defined start condition +  - The [[dido:99_annexes:annex-b-terms-and-definitions:a:acceptance_criteria|Acceptance Criteria]] identify the measured Infrastructure Environment creation activity 
-  - The applicable Deployment Duration Acceptance Criteria identify a defined completion condition +  - The Acceptance Criteria identify the start condition 
-  - The applicable Deployment Duration Acceptance Criteria identify a maximum permitted duration or another objective duration threshold +  - The Acceptance Criteria identify the completion condition 
-  - The measured Deployment Duration begins when the defined start condition occurs +  - The Acceptance Criteria identify the permitted [[dido:99_annexes:annex-b-terms-and-definitions:d:deployment_duration|Deployment Duration]] 
-  - The measured Deployment Duration ends when the defined completion condition occurs +  - Measurement begins when the defined start condition occurs 
-  - The measured Deployment Duration satisfies the applicable Acceptance Criteria +  - Measurement ends when the defined completion condition occurs 
- +  - The calculated Deployment Duration does not exceed the duration established by the Acceptance Criteria 
-Verification includes: +  - The verification record preserves [[dido:99_annexes:annex-b-terms-and-definitions:t:traceability|Traceability]] among the Acceptance Criteria, the measured Infrastructure Environment creation, and the calculated Deployment Duration
- +
-  * Acceptance Criteria inspection +
-  * Deployment event inspection +
-  * Start-time capture +
-  * Completion-time capture +
-  * Elapsed-time calculation +
-  * Infrastructure Environment state inspection +
-  * Repeated duration measurements +
-  * Connected Environment tests +
-  * Disconnected Environment tests +
-  * [[dido:99_annexes:annex-b-terms-and-definitions:a:air-gapped_environment|Air-Gapped Environment]] tests +
-  * End-to-end [[dido:99_annexes:annex-b-terms-and-definitions:c:ci_cd_pipeline|CI/CD Pipeline]] tests +
- +
-The verification record identifies: +
- +
-  - The applicable Deployment Duration Acceptance Criteria +
-  - The operational context +
-  - The selected [[dido:99_annexes:annex-b-terms-and-definitions:c:controlled_input|Controlled Inputs]] +
-  - The applicable Infrastructure Environment type +
-  - The defined start condition +
-  - The defined completion condition +
-  - The recorded start time +
-  - The recorded completion time +
-  - The calculated Deployment Duration +
-  - The applicable duration threshold +
-  - The observed result +
-  - The generated [[dido:99_annexes:annex-b-terms-and-definitions:e:evidence|Evidence]] +
- +
-===== Requirements Realized By ===== +
- +
-This requirement is realized by: +
- +
-  * [[dido:02-crusible:99-annexes:annex-c-requirements:02-operational-requirements:or-002|OR-002 — Deployment Environments]] +
-  * [[dido:02-crusible:99-annexes:annex-c-requirements:02-operational-requirements:or-003|OR-003 — Classified and Unclassified Environments]] +
-  * [[dido:02-crusible:99-annexes:annex-c-requirements:02-operational-requirements:or-004|OR-004 — Concurrent Environment Management]] +
-  * [[dido:02-crusible:99-annexes:annex-c-requirements:03-functional-requirements:03-02-image-management:start|FR-IMG-001 through FR-IMG-006]] +
-  * [[dido:02-crusible:99-annexes:annex-c-requirements:03-functional-requirements:03-03-deployment-orchestration:start|FR-DEP-001 through FR-DEP-007]] +
-  * [[dido:02-crusible:99-annexes:annex-c-requirements:03-functional-requirements:03-05-air-gap-operations:start|FR-AG-001 through FR-AG-005]] +
-  * [[dido:02-crusible:99-annexes:annex-c-requirements:03-functional-requirements:03-08-devsecops-integration:start|FR-DSO-001 through FR-DSO-006]] +
-  * [[dido:02-crusible:99-annexes:annex-c-requirements:13-key-value-proposition-requirements:kvp-001|KVP-001 — Reduce Environment Deployment Timelines]] +
- +
-===== Related Architecture Sections ===== +
- +
-  * [[dido:02-crusible:06-machine-images-and-image-layers:start|6. Machine Images and Image Layers]] +
-  * [[dido:02-crusible:07-infrastructure-and-deployment:start|7. Infrastructure and Deployment]] +
-  * [[dido:02-crusible:08-dependencies-and-air-gap-operations:start|8. Dependencies and Air Gap Operations]]+
  
 ===== Referenced By ===== ===== Referenced By =====
Line 168: Line 77:
 ===== Delivery Phase ===== ===== Delivery Phase =====
  
-Phase 1 and subsequent phases+Implemented and Verified
  
 ===== Implementation Status ===== ===== Implementation Status =====
  
-Not Assessed +<todo>Measure the current Crucible implementation against the Deployment Duration established by the Acceptance Criteria.</todo>
- +
-Implementation status requires measurement of the current Crucible implementation against the applicable Deployment Duration Acceptance Criteria.+
  
 ===== Requirement Status ===== ===== Requirement Status =====
  
-Draft+<todo>Review and accept MO-001b as a proposed derived requirement created from the evaluation and decomposition of MO-001 in the Crucible System Requirements Specification, Version 1.1 Draft.</todo> 
 + 
 +---- 
 +===== Issues ===== 
 + 
 +The following unresolved issues affect this requirement: 
 + 
 +<todo>Define the Infrastructure Environment creation activity measured by the Deployment Duration.</todo>
  
-This requirement derives from MO-001 in the Crucible System Requirements Specification, Version 1.1 Draft.+<todo>Define the start condition and completion condition used to calculate the Deployment Duration.</todo> 
 + 
 +<todo>Define the permitted Deployment Duration and identify the controlling Acceptance Criteria.</todo> 
 + 
 +<todo>Identify any operational conditions, exclusions, or measurement tolerances that affect the Deployment Duration.</todo>
  
 ---- ----
Line 189: Line 107:
 This page is a leaf requirement page and omits a trailing '':start'' from its namespace. This page is a leaf requirement page and omits a trailing '':start'' from its namespace.
  
-Changes to the Statement SHALL preserve the deployment-duration intent derived from MO-001.+The parent MO-001 page is a non-leaf page and retains a trailing '':start'' in its namespace. 
 + 
 +Changes to the Statement should preserve:
  
-The applicable Acceptance Criteria should define:+  * [[dido:99_annexes:annex-b-terms-and-definitions:c:crucible|Crucible]] as the responsible actor 
 +  * Creation of an [[dido:99_annexes:annex-b-terms-and-definitions:i:infrastructure_environment|Infrastructure Environment]] as the measured activity 
 +  * [[dido:99_annexes:annex-b-terms-and-definitions:d:deployment_duration|Deployment Duration]] as the performance constraint 
 +  * [[dido:99_annexes:annex-b-terms-and-definitions:a:acceptance_criteria|Acceptance Criteria]] as the source of the duration constraint 
 + 
 +The Acceptance Criteria should identify:
  
   * The measured activity   * The measured activity
   * The start condition   * The start condition
   * The completion condition   * The completion condition
-  * The duration threshold +  * The permitted duration 
-  * The operational context+  * The operational conditions
   * Any permitted exclusions   * Any permitted exclusions
   * The required measurement precision   * The required measurement precision
  
-Material changes should receive review and should update the related verification criteria, requirements realization, related architecture sections, and source records.+Material changes should receive review and should update the verification criteria, source records, and Issues section.
  
 To reference this requirement Statement from another wiki page, insert: To reference this requirement Statement from another wiki page, insert:
Line 207: Line 132:
 <code dokuwiki> <code dokuwiki>
 {{section>dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-001:mo-001b#Statement&noheader&nofooter&noeditbtn}} {{section>dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-001:mo-001b#Statement&noheader&nofooter&noeditbtn}}
-</code> 
- 
-Do not rename this page after an external citation unless a redirect or move plan is in place. 
- 
----- 
- 
-<WRAP centeralign> 
-© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc. 
-</WRAP> 
-  * [[dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-001:start|MO-001 — Repeatable, Compliant, and Secure Infrastructure Environments]] 
- 
-The Original Requirement states: 
- 
-> //Crucible SHALL enable rapid creation of repeatable, compliant, and secure infrastructure environments.//[[dido:02-crusible:99-annexes:annex-b:cr-001|[C1]]] 
- 
-MO-001a preserves the portion of the Original Requirement that requires [[dido:99_annexes:annex-b-terms-and-definitions:c:crucible|Crucible]] to create an [[dido:99_annexes:annex-b-terms-and-definitions:i:infrastructure_environment|Infrastructure Environment]]. 
- 
-The separate requirements derived from MO-001 address: 
- 
-  * [[dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-001:mo-001b|MO-001b — Deployment Duration]] 
-  * [[dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-001:mo-001c|MO-001c — Reproducibility]] 
-  * [[dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-001:mo-001d|MO-001d — Security Baseline Conformance]] 
-  * [[dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-001:mo-001e|MO-001e — Compliance Baseline Conformance]] 
- 
-===== Assessment ===== 
- 
-The Original Requirement uses **enable**, which describes facilitation rather than the behavior [[dido:99_annexes:annex-b-terms-and-definitions:c:crucible|Crucible]] performs. 
- 
-The Original Requirement also combines Infrastructure Environment creation, deployment duration, reproducibility, security, and compliance within one normative statement. Each outcome can be implemented, verified, and traced independently. 
- 
-MO-001a: 
- 
-  * Replaces **enable** with the direct action **create** 
-  * Identifies [[dido:99_annexes:annex-b-terms-and-definitions:c:crucible|Crucible]] as the responsible actor 
-  * Identifies the [[dido:99_annexes:annex-b-terms-and-definitions:i:infrastructure_environment|Infrastructure Environment]] as the required result 
-  * Identifies the selected [[dido:99_annexes:annex-b-terms-and-definitions:c:controlled_input|Controlled Inputs]] as the source used to create the Infrastructure Environment 
-  * Separates Infrastructure Environment creation from the independently verifiable duration, reproducibility, security, and compliance outcomes 
- 
-===== Rationale ===== 
- 
-Infrastructure Environment creation provides the foundational outcome upon which the remaining requirements derived from MO-001 depend. 
- 
-The selected [[dido:99_annexes:annex-b-terms-and-definitions:c:controlled_input|Controlled Inputs]] identify the approved and controlled material used during Infrastructure Environment creation. Controlled Inputs include applicable descriptions, baselines, configurations, Image Layers, Machine Images, packages, and other required [[dido:99_annexes:annex-b-terms-and-definitions:a:artifact|Artifacts]]. 
- 
-Creating an Infrastructure Environment from selected Controlled Inputs supports: 
- 
-  * Deterministic input selection 
-  * [[dido:99_annexes:annex-b-terms-and-definitions:p:provenance|Provenance]] 
-  * [[dido:99_annexes:annex-b-terms-and-definitions:t:traceability|Traceability]] 
-  * Configuration control 
-  * Subsequent reproduction and comparison 
-  * Independent evaluation of security and compliance outcomes 
- 
-This requirement does not establish a required creation duration, equivalence criterion, Security Baseline, or Compliance Baseline. The other requirements derived from MO-001 establish those outcomes. 
- 
-===== Applies To ===== 
- 
-This requirement applies to: 
- 
-  * [[dido:99_annexes:annex-b-terms-and-definitions:c:crucible|Crucible]] 
-  * [[dido:99_annexes:annex-b-terms-and-definitions:i:infrastructure_environment|Infrastructure Environments]] 
-  * [[dido:99_annexes:annex-b-terms-and-definitions:c:controlled_input|Controlled Inputs]] 
-  * [[dido:99_annexes:annex-b-terms-and-definitions:d:declarative_description|Declarative Descriptions]] 
-  * [[dido:99_annexes:annex-b-terms-and-definitions:c:crucible_description|Crucible Descriptions]] 
-  * [[dido:99_annexes:annex-b-terms-and-definitions:b:baseline|Baselines]] 
-  * [[dido:99_annexes:annex-b-terms-and-definitions:b:baseline_composition|Baseline Composition]] 
-  * [[dido:99_annexes:annex-b-terms-and-definitions:i:image_layer|Image Layers]] 
-  * [[dido:99_annexes:annex-b-terms-and-definitions:i:infrastructure_baseline|Infrastructure Baselines]] 
-  * [[dido:99_annexes:annex-b-terms-and-definitions:m:machine_image|Machine Images]] 
-  * [[dido:99_annexes:annex-b-terms-and-definitions:i:infrastructure_configuration|Infrastructure Configurations]] 
-  * [[dido:99_annexes:annex-b-terms-and-definitions:i:infrastructure_deployment|Infrastructure Deployment]] 
-  * [[dido:99_annexes:annex-b-terms-and-definitions:p:provisioning|Provisioning]] 
-  * [[dido:99_annexes:annex-b-terms-and-definitions:a:artifact|Artifacts]] 
-  * [[dido:99_annexes:annex-b-terms-and-definitions:p:provenance|Provenance]] 
-  * [[dido:99_annexes:annex-b-terms-and-definitions:t:traceability|Traceability]] 
- 
-===== Verification ===== 
- 
-Verification confirms that: 
- 
-  - [[dido:99_annexes:annex-b-terms-and-definitions:c:crucible|Crucible]] creates an [[dido:99_annexes:annex-b-terms-and-definitions:i:infrastructure_environment|Infrastructure Environment]] 
-  - Crucible uses the selected [[dido:99_annexes:annex-b-terms-and-definitions:c:controlled_input|Controlled Inputs]] to create the Infrastructure Environment 
- 
-Verification includes: 
- 
-  * Controlled Input inspection 
-  * [[dido:99_annexes:annex-b-terms-and-definitions:c:crucible_description|Crucible Description]] inspection 
-  * [[dido:99_annexes:annex-b-terms-and-definitions:b:baseline_composition|Baseline Composition]] inspection 
-  * Workspace inspection 
-  * [[dido:99_annexes:annex-b-terms-and-definitions:m:machine_image|Machine Image]] build tests 
-  * [[dido:99_annexes:annex-b-terms-and-definitions:i:infrastructure_deployment|Infrastructure Deployment]] tests 
-  * [[dido:99_annexes:annex-b-terms-and-definitions:p:provisioning|Provisioning]] tests 
-  * Infrastructure state inspection 
-  * End-to-end [[dido:99_annexes:annex-b-terms-and-definitions:c:ci_cd_pipeline|CI/CD Pipeline]] tests 
- 
-The verification record identifies: 
- 
-  - The selected [[dido:99_annexes:annex-b-terms-and-definitions:c:controlled_input|Controlled Inputs]] 
-  - The applicable input identifiers and revisions 
-  - The applicable [[dido:99_annexes:annex-b-terms-and-definitions:c:crucible_description|Crucible Description]] 
-  - The applicable [[dido:99_annexes:annex-b-terms-and-definitions:b:baseline_composition|Baseline Composition]] 
-  - The created [[dido:99_annexes:annex-b-terms-and-definitions:i:infrastructure_environment|Infrastructure Environment]] 
-  - The applicable [[dido:99_annexes:annex-b-terms-and-definitions:p:provenance|Provenance]] 
-  - The observed result 
-  - The generated [[dido:99_annexes:annex-b-terms-and-definitions:e:evidence|Evidence]] 
- 
-===== Requirements Realized By ===== 
- 
-This requirement is realized by: 
- 
-  * [[dido:02-crusible:99-annexes:annex-c-requirements:02-operational-requirements:or-002|OR-002 — Deployment Environments]] 
-  * [[dido:02-crusible:99-annexes:annex-c-requirements:02-operational-requirements:or-003|OR-003 — Classified and Unclassified Environments]] 
-  * [[dido:02-crusible:99-annexes:annex-c-requirements:02-operational-requirements:or-004|OR-004 — Concurrent Environment Management]] 
-  * [[dido:02-crusible:99-annexes:annex-c-requirements:02-operational-requirements:or-005|OR-005 — Distributed Environment Management]] 
-  * [[dido:02-crusible:99-annexes:annex-c-requirements:03-functional-requirements:03-01-configuration-management:start|FR-CFG-001 through FR-CFG-005]] 
-  * [[dido:02-crusible:99-annexes:annex-c-requirements:03-functional-requirements:03-02-image-management:start|FR-IMG-001 through FR-IMG-006]] 
-  * [[dido:02-crusible:99-annexes:annex-c-requirements:03-functional-requirements:03-03-deployment-orchestration:start|FR-DEP-001 through FR-DEP-007]] 
-  * [[dido:02-crusible:99-annexes:annex-c-requirements:03-functional-requirements:03-08-devsecops-integration:start|FR-DSO-001 through FR-DSO-006]] 
-  * [[dido:02-crusible:99-annexes:annex-c-requirements:03-functional-requirements:03-09-baseline-composition-and-workspace:start|FR-BAS-001 through FR-BAS-004]] 
- 
-===== Related Architecture Sections ===== 
- 
-  * [[dido:02-crusible:05-descriptions-composition-and-baselines:start|5. Descriptions, Composition, and Baselines]] 
-  * [[dido:02-crusible:06-machine-images-and-image-layers:start|6. Machine Images and Image Layers]] 
-  * [[dido:02-crusible:07-infrastructure-and-deployment:start|7. Infrastructure and Deployment]] 
- 
-===== Referenced By ===== 
- 
-The following pages reference this requirement: 
- 
-{{backlinks>.#dido:02-crusible}} 
- 
-===== Delivery Phase ===== 
- 
-Phase 1 and subsequent phases 
- 
-===== Implementation Status ===== 
- 
-Not Assessed 
- 
-Implementation status requires verification that the current [[dido:99_annexes:annex-b-terms-and-definitions:c:crucible|Crucible]] implementation creates an Infrastructure Environment from the selected Controlled Inputs. 
- 
-===== Requirement Status ===== 
- 
-Draft 
- 
-This requirement derives from MO-001 in the Crucible System Requirements Specification, Version 1.1 Draft. 
- 
----- 
-===== Notes for Editors ===== 
- 
-This requirement page should retain the stable requirement identifier ''MO-001a''. 
- 
-This page is a leaf requirement page and omits a trailing '':start'' from its namespace. 
- 
-Changes to the Statement SHALL preserve the Infrastructure Environment creation intent derived from MO-001. 
- 
-Material changes should receive review and should update the related verification criteria, requirements realization, related architecture sections, and source records. 
- 
-To reference this requirement Statement from another wiki page, insert: 
- 
-<code dokuwiki> 
-{{section>dido:02-crusible:99-annexes:annex-c-requirements:01-mission-objectives:mo-001:mo-001a#Statement&noheader&nofooter&noeditbtn}} 
 </code> </code>
  
  • dido/02-crusible/99-annexes/annex-c-requirements/01-mission-objectives/mo-001/mo-001b.1784559188.txt.gz
  • Last modified: 2026/07/20 07:53
  • by nick_dido