Differences

This shows you the differences between two versions of the page.

Link to this comparison view

dido:00-sip-ra:04-instructions-for-submitters:04-8-proof-of-concept:start [2026/07/08 13:21] – created nick_didodido:00-sip-ra:04-instructions-for-submitters:04-8-proof-of-concept:start [2026/07/18 12:33] (current) – external edit 127.0.0.1
Line 11: Line 11:
   * This specification has completed the design phase and is in the process of being prototyped   * This specification has completed the design phase and is in the process of being prototyped
   * An implementation of this specification has been in beta test for four months   * An implementation of this specification has been in beta test for four months
-  * A named product with a specified customer base realises this specification+  * A named product with a specified customer base realizes this specification
  
 Submitters SHALL demonstrate the technical viability of their proposal to the satisfaction of the Task Force managing the evaluation process. Submitters SHALL demonstrate the technical viability of their proposal to the satisfaction of the Task Force managing the evaluation process.
  • dido/00-sip-ra/04-instructions-for-submitters/04-8-proof-of-concept/start.1783542081.txt.gz
  • Last modified: 2026/07/08 13:21
  • by nick_dido